Flexible Climbing Formwork (GJ190) with high level of standardization and universality

Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews

Flexible Climbing Formwork (GJ190) with high level of standardization and universality

Descrition:

Brief Introduction


Climbing bracket GJ190 is mainly used as operating platform during construction. It can be used in

 the vertical wall and arced wall. The bracket hangs on the anchor system which is the supporting system 

during construction. It’s easy to assemble and disassemble, and the construction is easy , rapid and economical. 
The folding climbing bracket is easy to assemble and disassemble, and concvenient for storage, transportation 

and reusing.
The system can also be used as climbing formwork in the concrete pouring of vertical or arced wall. 

The concrete lateral pressure is entirely supported by anchor system and the wall-through tie-rods, 

so additional reinforcement is not needed. The construction is easy, rapid and safe.

 

The Characteristics


1. The loads of bracket, formwork as well as other loads during construction are completely supported

 by the anchor system. There is no need of scaffolding. It’s suitable for construction of projects in high altitude.
2 .The climbing bracket could be folded , and It is convenient  to assemble, save and reuse.
3 .The formwork can lean forward or backward by adjusting the pull-push prop, and it can reach an inclination

 of 18 degrees at most.
4 .All connectors are on a high level of standardization and universality. 
5. All components are connected in an assembling way, which is convenient, flexible and reliable.
6 .Long and short pull-push props work together to adjust the formwork in veritcal direction.
7. It can be applied for supporting arced formwork or panel formwork, on a case-by-case basis according to the design.   

 

Two  kinds of Installation Type 

for conical(bridge) pier

for cylindrical (bridge) pier

 

 


Send message to this supplier
Mr. Errol Chen (Sales Director)
Tel: 86-10-69408442
Mobile: 86-13426250874
Enter between 20 to 3,000 chatacters.
Contact Method
Beijing Zulin Formwork & Scaffolding Co., Ltd
Juyuan Industry Field No.20, Mapo Town, Shunyi District, Beijing, China (Mainland) / 101300
Fax: 86-10-69409139
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center