Automatic Brick Stacking Machine

Payment Terms: T/T,L/C,WU,
skype
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • Brand Name: FW 
  • Place of Origin: Henan  
  • Min.Order: 1 Set/Sets
  • Means of Transport: Ocean
Supply Capacity
  • Packing:wooden pallet
A detailed introduction of automatic brick setting machine's daily operation and maintenance: (I) Precautions for automatic brick setting machine's use: Before starting the machine, you need to check whether each electric thread is loose or not. Hydraulic pump's direction: 1. Whether it is right and ground wire is firm, add hydraulic oil to the middle of the ruler. It uses 46 # wear-resisting hydraulic oil. 2. The travelling gear's tracks must be corrected the level, and the suggested track is using 24 kg/m. The centers of adobe cutting machine, adobe separating machine and swivel plate must be aligned with the center of clamp adobe machine. 3. Clamp adobe machine should be corrected after installation, making the traveller vertical, correcting the clamp adobe machine's level. Correct rail cylinder and the rail, making them in parallel. (II) Automatic brick setting machine's regular maintenance: 1. Whether automatic brick setting machine can work normally, regular maintenance is very important. The content is as follows: Brick setting machine, cutting-off table and adobes separating machine's slide bar should be took apart and cleaned after being used for three months, and then you need add some new grease. 2. Fasten the joints, flanges and screws, fixed screw connection lines of hydraulic cylinder, electrical switches and stop limit for one time every month. Replace the sealing elements, and do it once a year. 3. Clean or replace hydraulic components, hydraulic valves every three months, clean hydraulic cylinder every six months. Clean or replace filter elements, clean tank pipe after hydraulic systems being used for three to four months. The above is the maintenance information of automatic brick setting machine.
Send message to this supplier
Ms. Alice (sales)
Tel: 86-371-60263088
Mobile: +86-13592531525
Enter between 20 to 3,000 chatacters.
Contact Method
Gongyi Fuwei Heavy Machinery Plant
Mid xinxing road, Zhengzhou, Henan, China (Mainland) / 451200
Fax: 86-371-86522382
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center