U-bend seamless tubes

Price: 1000.0~3000.0 USD
Trade Term: CFR
Payment Terms: T/T,L/C,D/P
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • Place of Origin: Shanghai  
  • Min.Order: 10 Ton
  • Means of Transport: Ocean, Land
Supply Capacity
  • Production Capacity: 1000 tongs/year
  • Packing:in wooden boxes
  • Delivery Date: 30 days
 U-bend seamless tubes
EN 10204, heat exchangers, heater tubes, Seamless tube, seamless tubes, U bend tube, U bend tubes
Each U bend tube of our range is rigorously quality checked by our team of talented professionals on every stage of production to deliver the clients defect free best quality products. These U bend tubes can be custom designed in various diameters as per the requirements of our clients.
Available in different specifications, these U bend tubes can be custom designed in various diameters as per the requirements of our clients.
Application:
  • Boilers, heat exchangers, super heaters, condensers
Production Standard, Grade, Steel No:
  • ASTM A688/A688M-Welded Austentic Steel Feedwater Heater Tubes.
  • ASTM A 312/213/269,DIN 17458/2462,BS3605/1,JIS, ASME SA556 G3429/3459,ISO1129/2037/9329,GB/T14975/14976/13296 and so on.
Material:
  • TP304,TP304L,TP316,TP316L,TP321,TP310S,TP347H,TP316Ti,
  • Carbon steel
  • alloys and so on.
Proces:
  • The removal of beads is done as per standard specifications.
  • Bead is cold worked.
  • It is brought in level with the base metal.
Before heat treatment on tube mill, bead rolling is made in-line.
This will help in recrystallization of weld structure.
The weld structure will also homogenize faster in annealing process.
Length: unbending length or fix length
Mill test certificate: according to EN 10204 3.2
Packing: Wooden cases, bundle or plastic bags, plywood boxes
Oil-dip, Varnish, Passivation, Phosphating, Shot Blasting.
Features :
  • U bending is done by cold working process.
  • U bending is done to the required radius as per customer drawings.
  • The bend portion and six inch leg is stress relieved by resistance heating.
  • Inert gas (Argon) is passed through it at the required flow rate to avoid oxidation in ID.
  • The radius is checked for its OD and wall thinning with the recommended specification.
  • The physical properties and micro-structure is checked at three different position.
  • Visual inspection for waviness and cracks is done with Dye Penetrant Test.
  • Each tube is then hydro tested at the recommended pressure to check for leakage.
  • Cotton ball test is done to check the ID cleanliness of the tube.

Send message to this supplier
Mr. Peter Lee
Tel: 86-21-61851035
Enter between 20 to 3,000 chatacters.
Contact Method
Yosin Steel Pipe Co., ltd.
No.903,North ZhongShan No.1 Road, Shanghai, China (Mainland) / 200235
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center