Classification:one is to protect the road, for example, on the road side used to resist flood protection embankment road; in the reinforcement of the roadbed side.
Another is the construction process, the heavy six angle on the roadbed or pouring cement road surface, as a reinforcement net, on the cement road surface, which can prevent the pavement cracking. Artificial land bank.
Another is the construction process, the heavy six angle on the roadbed or pouring cement road surface, as a reinforcement net, on the cement road surface, which can prevent the pavement cracking. Artificial land bank.
Contact:Rachel Ren
Skype:rachelren2013
Anping County Jinhao Wire Mesh Co.,Lt