seamless carbon steel tubes can be divided into low pressure pipe
medium pressure pipe, high pressure boiler pipe, alloy steel pipe, petroleum cracking pipe, and for construction ,for linepipe
According to the different manufacturing methods, seamless carbon steel tubes can be divided into hot rolled seamless steel pipe,cold rolled seamless steel pipe and cold drawn seamless steel pipe. Cold rolled has better dimensional accuracy than hot working.
Specifications for carbon seamless steel pipe:
1)Pipe Process method: Cold drawn, Cold rolled,hot rolled ,hot expansion.
2) Surface finish: Varnishing ,black rust-proof oil,transparent oil, Annealed,3LDPE ,3HDPE,2PP cold pilgered, manual polished, mechanical polished
3) Standards and Material: API SPEC 5CT, ASTM A53, ASME SA53, ASTM A106,API SPEC 5L
ASTM A106 GRB, A53A335, ST37, ST52
4)Pipe Size:OD 60.3mm -914mm WT 2mm - 55mm
5) Length: Double random,single random,fixed and more.
1m~16m
6) End Finish: Plain ends or End Bevelled
7) Applications: long-distance oil and gas conveying, fluid transportation pipeline,constuction ,pile
8) Packing term: Standard seaworthy packing, General bunch packing
Home >
Construction & Decoration
>
Pipe & Fittings
>
Steel & Iron Pipes
>
Seamless steel pipe with for with 60mm~914mm
Seamless steel pipe with for with 60mm~914mm
Price: | 500.0~900.0 USD |
---|---|
Trade Term: | FOB |
Payment Terms: | T/T,L/C |
Trade on HiSupplier, Worry Free Guarantee
•Trading safety, secure your money, lower the risk, protect both buyers and suppliers
•HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
- Product Details
- Company Profile
- Product Reviews
Basic Info.
- Technique: Seamless
- Brand Name: Ruisheng
- Specification: 2'' to 30 inches
- Grade: Carbon steel
- Outer Diameter: DN60 to DN900
- Thickness: 2mm~60mm
- Length: 4m~16m
- Usage: For constrution and transport
- Model No.: czrs-312
- Place of Origin: Hebei
- Min.Order: 20 Ton
- Means of Transport: Ocean, Land
Supply Capacity
- Production Capacity: 50000 tons/M
- Packing:In bundle or carton
- Delivery Date: 15 ~ 45 days
Didn't find what you're looking for?
Post Buying Lead or
contact our customer service specialist for help!