FRP Maintenance Stairway Cooling Tower Parts , Customized Height

 

 

Quick Detail:

 

The manufacturing process for FRP product consists of 7 processes: Raw materials preparation, Mold preparation, Hand paste molding, Solidify, Take off the mold, Disposal, Inspection (see the diagram as below). Each Technique has to be conducted according to the Operation Manuel.

 

 

Specifications:

 

MODEL

Total Max Width

Total Max Height

Width of per step

Height of per step

Width of non-slip surface

Width of top  non-slip surface

Max

840mm

1980mm

228mm

220mm

120mm

100mm

The height could be adjusted by client’s requirement.

 

 

Description:

 

  1. Molding Condition:

     To assure the quality of the accurate FPR product, the molding should be under flowing conditions:

  • keep a constant temperature between 15 to 25 in the FPR molding workshop.
  • keep the humidity under 75 in the workshop too.
  1. Raw materials Preparation

     The raw materials used for FRP product are as follows:

  • Fiberglass fabric and Fiberglass Felt
  • Resin
  • Coating
  1. Mold Preparation
  • Make the fiberglass mold according to the inner shape of the product and the precision requirement.
  • Make sure it is smooth and no default on the surface.
  1. Hand Paste Molding Technique
  • Spray resin coat by American Douglas coat spray machine on the surface of the mold.
  • Pre-make the reinforced bar according to drawings.
  • Put the pre-make reinforced bar in the right place, and wrap it with fabric until it gets to the designated depth.
  • Examine if the edge is leaking and it still has bubbles after pasting.
  1. Solidity
  • Make sure the solidify temp. is 25%±3, the humidity not above 80%(The workshop must be thermostatic and desiccative.)
  • The mold cannot be taken off until it has been solidified for 10 hours (solidifying temperature 25±3) and the degree of cure has reached 80% ( Barcol rigidity> 41).
  1. De-molding
  • Push the mold out, prize and press are not allowed.
  • Put the De-molding product on the soft fabrics and then move to the designated place in case distortion or abrade.
  1. Final disposal
  • Get rid of the thorn, bubbles on the surface, spray resin after the cleaning job.
  • Cut the edge according to the design requirements.

 

 

Applications:

 

For maintenance

 

 

Competitive Advantage:

 

1.Non-slip and firmly

2.Convenience for Maintainence

3.Long life

4.Ageing Resistance and Ultraviolet

 

 


Send message to this supplier
Ms. chenmei
Tel: 86-0519-83665582
Mobile: 86-15961130909
Enter between 20 to 3,000 chatacters.
Contact Method
Changzhou Kwell Cooling Equipment Co.,Ltd
No. 18 Dongfang Nan Road, Wujin Economic Development Zone, Changzhou, Jiangsu, China (Mainland) / 213000
Fax: 86-0519-83665582
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center