ACC Fan Bell Cooling Tower Parts Replace , Customized Dimension

Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews

 

ACC Fan Bell Cooling Tower Parts Replace , Customized Dimension

 

 

Quick Detail:

 

The manufacturing process for FRP product consists of 7 processes: Raw materials preparation, Mould preparation, Hand paste molding, Solidify, Take off the mould, Disposal, Inspection (see the diagram as below). Each Technique has to be conducted according to the Operation Manuel.

 

 

Description:

  1. Moulding Condition:

     To assure the quality of the accurate FPR product, the moulding should be under flowing conditions:

  • keep a constant temperature between 15 to 25 in the FPR moulding workshop.
  • keep the humidity under 75 in the workshop too.
  1. Raw materials Preparation

     The raw materials used for FRP product are as follows:

  • Fiberglass fabric and Fiberglass Felt
  • Resin
  • Coating
  1. Mould Preparation
  • Make the fiberglass mould according to the inner shape of the product and the precision requirement.
  • Make sure it is smooth and no default on the surface.
  1. Hand Paste Molding Technique
  • Spray resin coat by American Douglas coat spray machine on the surface of the mould.
  • Pre-make the reinforced bar according to drawings.
  • Put the pre-make reinforced bar in the right place, and wrap it with fabric until it gets to the designated depth.
  • Examine if the edge is leaking and it still has bubbles after pasting.
  1. Solidity
  • Make sure the solidify temp. is 25%±3, the humidity not above 80%(The workshop must be thermostatic and dehumidifify)
  • The mould cannot be taken off until it has been solidified for 10 hours (solidifying temperature 25±3) and the degree of cure has reached 80% (Barchol rigidity> 41).
  1. Demoulding
  • Push the mould out, prize and press are not allowed.
  • Put the Demoulding product on the soft fabrics and then move to the designated place in case distortion or abrade.
  1. Final disposal
  • Get rid of the thorn, bubbles on the surface, spray resin after the cleaning job.
  • Cut the edge according to the design requirements.

 

 

Specifications:

 

MODEL

Diameter

Height

Remarks

FR22

22FT

5FT

 

FR24

24FT

5FT

 

FR26

26FT

5FT

 

FR28

28FT

5FT

 

FR30

30FT

6FT

 

FR32

32FT

6FT

 

FR34

34FT

Send message to this supplier
Ms. chenmei
Tel: 86-0519-83665582
Mobile: 86-15961130909
Enter between 20 to 3,000 chatacters.
Contact Method
Changzhou Kwell Cooling Equipment Co.,Ltd
No. 18 Dongfang Nan Road, Wujin Economic Development Zone, Changzhou, Jiangsu, China (Mainland) / 213000
Fax: 86-0519-83665582
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!