Scaffolding Formwork system Bridge Pier Formwork for pouring cement / concrete

Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews

Scaffolding Formwork system Bridge Pier Formwork for pouring cement / concrete

 

Quick Details

 

Steel Formworks
Material::

Q235 steel plate

Formworks
Thickness::

3-6mm Length:: 1000-1800mm
Width:: 100-800mm Height:: 55mm Steel Formworks Colour:: dark red/blue/orange

Formworks
Application::

concrete construction

Steel Formworks
Using range::

building/bridge/tank/tunnel

Steel Formworks
Surface finished::

spray painted
Certification:: SGS

 
 

Specifications

 
Steel Scaffolding Formwork
1.Panel Formwork
2.Electroplated Q235Steel
3.QuickErect Formwork
4.High Concrete Pouring

Scaffolding Formwork system Bridge Pier Formwork for pouring cement/concrete  
 
FEATURES OF Steel Plate for Shuttering formwork
 
This type of  Steel scaffolding formwork is a kind of tool formwork, which consists of numerous 
modular plates, angle formwork, braces and connecting pieces.The formwork is provided with climbing
holes specially designed for the placement of counter bolts, which is applicable to the foundations 
of buildings both at home and abroad.
 
The construction unit may assemble the formwork and install the climbing bolts in line with the proposal for 
the arrangement of formwork prepared in advanceConstruction of concrete wall, beam as well as 
independent oblong column.
 
 
Excellent performace of Steel scaffolding formwork
 
1. Easy To Handle: Easy operation, workers under correct direction will be competent for the work. 
2. Widely Used: Free size, suitable for any height by connecting different size vertical props together. 
3. Improving Construction: Make the construction site neat and clear, improve the project Quality. 
4. Recycling: The life cycle is about 300 times. 
5. Working load: 450kg(max);   
 
Available size of  Scaffolding Formwork system   
 

 Length(mm)  Width(mm)  Height(mm)
 1800  600  55
 1500  450  55
1500  300
Send message to this supplier
Mr. Tom
Tel: 86-20-3286952
Enter between 20 to 3,000 chatacters.
Contact Method
Guangzhou DSTSA Construction Material Co., Ltd
Room 1501,Building 03,Dongkeng Sanheng Zhong Road No.01,Xintang Town,Zengcheng, Guangzhou, Guangdong, China (Mainland)
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!