PPR Ball Valves With Brass Ball Pipe Fittings

Price: 1.26~15.0 USD
Trade Term: FOB
Payment Terms: T/T,L/C
skype
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • Head Code: Others 
  • Shape: Equal 
  • Technics: Others 
  • Type: Coupling 
  • Material: PP-R 
  • Connection: Others 
  • Brand Name: OEM 
  • Working Medium: Water Systems 
  • Working Pressure: PN25 
  • Working Temperature: 95℃ 
  • Specifications: Dn20~ Dn160 
  • MOQ: 10 cartons 
  • Process: Injection Moulding 
  • Delivery Time: Within 30 days 
  • Packing: As per customers' request 
  • Color: Grey,Green,White 
  • Port of Loading: Ningbo or Shanghai 
  • Model No.: XM-PPR031 
  • Place of Origin: Zhejiang  
  • Min.Order: 10 Pack/Packs
  • Means of Transport: Ocean, Air, Land
Supply Capacity
  • Production Capacity: 100000pcs/month
  • Packing:plastic bag and cartons
  • Delivery Date: 30 days

PPR Ball Valves With Brass Ball Pipe Fittings

***SPECIFICATIONS

PPR Ball Valves With Brass Ball Pipe Fittings
SizeNet WeightPCS/CTNMOQ
20mm98g12010 cartons
25mm145g9010 cartons
32mm240g5410 cartons
40mm458g3610 cartons
50mm750g2010 cartons
63mm1380g1210 cartons


***PPR Ball Valve With Brass Ball Features: Ball Valve mainly used for the opening and closing of pipes and equipment media 

  1. Features: (1) applicable to the regular operation, open and close quickly, light weight. 

(2) Full bore design, by capacity, fluid resistance. 

(3) covering design, relatively small size, light weight, and low cost. 

(4) sealing performance. 

(5) No vibration, low noise. 

(6) the opening and closing torque, switch light. 

(7) handle with user-friendly design, comfortable grip. . 

(8) 100% factory tested to ensure no leakage. 

2.Appling to: agricultural irrigation, aquaculture, civil construction, swimming pools, wastewater treatment, industrial applications and other drainage systems. 

3.Colors: white, gray, black, blue (the color can also be equipped according to customer needs)


***Suggestions for the Crrect Teatment of PP-R System:

1) Handle pipes with care, and avoid hard impacts at the end of the pipes.

2) Use suitable sharp cutting tools to cut the pipe with no burrs.

3) Do not twist the pipe or the fitting after joining together. Alignment up to 5 degrees relative to the axis of the pipe can be done immediately after joining.

4) Protect the pipes from sunlight and rain during storage and on site.

5) Don't use flame to bend pipes; heating with hot air up to 140 °C can be used when needed.

6) Use Teflon sealing tapes where necessary.

7) Avoid heavy and sharp loads on the pipes.

8) Follow the instructions for joining process.

9) Follow the right techniques for expansion compensation.

***FUSING TOOLS

The pipes and fittings in Type three PP-RC piping systems are connected through thermal fuse plugging.The thermal fusing tools are applied to melt the inner & outer surfaces of the fitting and pipes simultaneously and plug connect them under the specified temperature and conditions.The two pats are integrated uniformly and firmly when cooled.The connection provides good sealing,high reliablity and avoids any leakgae.See the table for fusing connection technical requirement.

***OPERATION REQUIREMENT

  1. Check whether or not the specifications of the pipes and fittings to be connected meet with the install action requirement before the construction.Special attention shall be paid not to misuse or mix up cold and hot water pipes;

  2. Check the visual quality of pipes and fittings.Remove any cracks found,oil and burs.Strictly follow specified technical parameters for operation.The pipes or fittings shall be inserted directly instead of being rolated during heating;

  3. There shall be a uniform fusing circle at the connection between pipes and fittings;

  4. In case of lack of skill,a line shall be marked at pipe insert point to confirm the depth,the manual insertion depth shall be strictly controlled to avoid any over insertion that causes blockage and negative influence to flow rate.

  5. The pipes can be sealed and used only after pressure test and acceptance.

***Techinical Parameter for Fusing Connection:

Pipe Outer Diamter

(mm)

Fusing Depth

(mm)

Heating Time

(Second)

Inserting Time

(Second)

Cooling Time

(Second)

2014542
2515742
3216.5864
40181264
50201864
63242486
752640108
903240108
11038.5501510
16056802015




Send message to this supplier
Mr. Vernon (President)
Tel: 86-574-88251303
Mobile: 13968332861
Enter between 20 to 3,000 chatacters.
Contact Method
DINGDANG INDUSTRY CO.,LIMITED
Room 1102,Huiya International, No.1107 Tiantong North Road, Yinzhou District, Ningbo, Zhejiang, China (Mainland) / 315100
Fax: 86-574-88251303
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center