Access safety system control box is made by multi-materials.
Construction & Decoration » Door » Automatic Door
They're made by different process and then machined to drawings and then assembled together and tested.
General lead time is 30 days for first samples, another few days for mass production run.
High low volume is acceptable. OEM service is offered.