Bow Shackle, Drop Forged, Square Head Pin
Material : bow and pin high tensile steel, Grade 6, quenched and tempered
Safety Factor : MBL equals 6 x WLL
Standard : meets performance requirements of US Fed. Spec. RR-C-271, Grade A
Finish : hot dipped galvanized
Certification : this product can be supplied with a works certificate, certificate of
basic raw material, manufacturer test certificate,Cert. Supplied As request.
Item No.
Made by TOOLEE
|
WEIGHT
/kg |
WLL
|
a
|
B
|
c
|
d
|
e
|
f
|
g
|
h
|
i
|
j
|
k
|
TL6TSAB16
|
0.34
|
2
|
13.5
|
16
|
34
|
13.5
|
22
|
51
|
32
|
91
|
58
|
63
|
22
|
TL6TSAB19
|
0.63
|
3.25
|
16
|
19
|
40
|
16
|
27
|
64
|
43
|
114
|
71
|
79
|
27
|
TL6TSAB22
|
1
|
4.75
|
19
|
22
|
47
|
19
|
31
|
76
|
51
|
136
|
82
|
94
|
32
|
TL6TSAB25
|
1.44
|
6.5
|
22
|
25
|
53
|
22
|
36
|
83
|
58
|
157
|
93
|
107
|
32
|
TL6TSAB28
|
2.21
|
8.5
|
25
|
28
|
60
|
25
|
43
|
95
|
68
|
176
|
108
|
124
|
36
|
TL6TSAB32
|
3.18
|
9.5
|
28
|
32
|
67
|
28
|
47
|
108
|
75
|
197
|
120
|
137
|
41
|
TL6TSAB35
|
4.32
|
12
|
32
|
35
|
74
|
32
|
51
|
115
|
83
|
218
|
137
|
154
|
50
|
TL6TSAB38
|
5.67
|
13.5
|
35
|
38
|
80
|
35
|
57
|
133
|
92
|
240
|
149
|
170
|
50
|
TL6TSAB42
|
7.36
|
17
|
38
|
45
|
89
|
38
|
60
|
146
|
99
|
262
|
164
|
183
|
60
|
TL6TSAB50
|
12.38
|
25
|
45
|
50
|
104
|
45
|
74
|
178
|
126
|
314
|
192
|
226
|
60
|
Supply information:
Price: Currently the main Reason concerning the Price is the Raw Material, Exchange Rate, and Labour Cost. Of course, Large Quatity we offer a Better Price. Please noted: Never Confirm the order Before we give you the confirmation if we offered you the price beyond 30 days.
Quality: Meet the standard of EN818-2, ASTM, ISO, American Standard, European Standard, EN12195-1/2.
Lead time: 30-60 days mainly according What item and how many quantities. Quantity: We don’t accept small Quantity with total value under USD5000.00.(Long time Cooperation can be accepted with few items)
Packing: Cartons Bags/Gunny Bags/Plastic Reel/Wooden Reel and Then on Pallets into Container. All for Sea-Transport.
Payment: T/T(Wire Transfer) or L/C at sight, Usually for First time we need about 30% as deposit, For Long time Cooperation, let’s disccuss based on Win2Win.
Price: Currently the main Reason concerning the Price is the Raw Material, Exchange Rate, and Labour Cost. Of course, Large Quatity we offer a Better Price. Please noted: Never Confirm the order Before we give you the confirmation if we offered you the price beyond 30 days.
Quality: Meet the standard of EN818-2, ASTM, ISO, American Standard, European Standard, EN12195-1/2.
Lead time: 30-60 days mainly according What item and how many quantities. Quantity: We don’t accept small Quantity with total value under USD5000.00.(Long time Cooperation can be accepted with few items)
Packing: Cartons Bags/Gunny Bags/Plastic Reel/Wooden Reel and Then on Pallets into Container. All for Sea-Transport.
Payment: T/T(Wire Transfer) or L/C at sight, Usually for First time we need about 30% as deposit, For Long time Cooperation, let’s disccuss based on Win2Win.