Double side Oxygen Fuel Gas Cylinder Manifold , Brass Gas Valve Manifold
1) Quick Detail:
1. Double-side gas cylinder manifold
2. Avoid the stop of gas supply
3. Material:brass
2) Description:
Double-side cylinder manifold adopts dual gas supply structure with a main supply cylinder group and a backup cylinder group.
1> Standard Configuration
1. High pressure hoses are metal hoses, or oxygen cylinder manifold uses red copper pipes, the acetylene cylinder m anifold uses chrome plated metal stainless steel pipes.
2. Flashback arrestor at the outlet of the acetylene and propane cylinder manifold.
3. For use of acetylene and propane cylinder manifold, the connecting cylinder rack, T-shaped wrench and adaptor are fitted at the outlet end of the acetylene and propane cylinders.
4. Adopting pressure reducer with large flow.
3) Applications:
1. When the pressure of the main supply cylinder group becomes too low to supply gas, turn off the valve of the main supply cylinder group, and at the same time turn on the valve of the backup cylinder group to start gas supply.
2. This type of cylinder manifold manually realizes the shift between the main gas supply and the backup one, which can avoid the stop of gas supply.
4) Specifications:
Model Number
|
LT-HL-01
|
Brand Name
|
Longteng,OEM
|
Place of Origin
|
Wuxi, China (Mainland)
|
Certification
|
CE,ISO
|
Loading Port
|
FOB Shanghai
|
Wearing Capacity
|
0.2
|
Impact Strength
|
50(Mpa)
|
Pipeline Thickness
|
2(mm)
|
Friction Coefficient
|
0.1
|
Fluid available
|
various gases
|
Material
|
Brass
|
Pipe Diameters
|
25mm
|
Using temperature range
|
75()
|
Gas Service
|
W1(mm)
|
H1(mm)
|
H2(mm)
|
O2, Air, Ar, He, N2
|
642
|
488
|
1400
|
C2H2, C3H8
|
642
|
662
|
1300
|
CO2
|
642
|
662
|
1400
|
5) Competitive Advantage:
1> Product Advantage:
1. Open structure design
2. Piping system adopted the sliver brazing,which can prevent leakage effectively.
3. Blind plug at the pipe end for possible extensive
4. System is equipped with gas filter device,which can filter the dust in the gas effectively.
5. Reserved the pressure switch interface
6. The whole system passed pressure test, safe and reliable.
7. Either wall or horizontal install