Interior Plastic Instrument panel Auto Parts Mould , Front / Rear Bumper Molding

Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews

Auto Parts Mould for automobile interior plastic instrument panel housing bumper  

 

 

Part Name Plastic Material Dimension  mm Cavity Cavity/Core Mold standard Gate type Remarks
Dummy 3/9H  Integral
ABS/PC 64*39*39 1+1 1.2343 (48-52HRC) DME sub gate 2 sliders 2 lifters

 

 

With the help ofCMM, projector, hardometer and some othermeasuring tools and equipments and team memebers" conscientiousness,we can guarantee the mold quality by inspecting in-coming material ,manufacturing process and samples.

 

 

Our main QC Process are as follows :


1. Customer’s Mold Specification Sheet Check 
2. Mold Design Control 
3. Mold Steel Hardness Inspection
4. Mold Electrodes Inspection
5. Mold Core and Cavity Steel Dimension Inspection
6. MoldPre-Assembly Inspection 
7. Mold Trial Report and Samples Inspection 
8. Final Full Inspection prior to shipment 
9. Mold Package Inspection

 

Mould material: P20 steel,  H13, NAK80, 2344, 2343, S136, 420  etc .
Runner Cold runner: Hot runner: Yudo/DME/HASCO
Certificate: ISO 
Standard: HASCO, DME, LKM
Specification drawings:
Pro/E, Auto CAD, Solidwork, CAXA UG, CAD/CAM/CAE.
Precision machining :
CNC, milling machine, drilling machine, numerical lathe, all types of lathe
Surface finish process: polishing, texturing sand blasting, heat treatment, painting,   electroplating, mirror polishing .
Shaping mould:injection mould and die-casting mould
Mould life: 1-2 million shots


1. Well mold design is half of success . Our engineering department have 25 experienced mold designers utilizing the latest design software such as
2D drawing : Auto CAD , E –drawing
3D drawing : Pro-E ,UG, Solidworks (wildfire version) ,Mastercam
Mold Flow Analysis 
2. We have a Project Management team to follow up the mold making :
Time Schedule: We will provide the time schedule every week to report the mold progress.
Dimensions report: Dimensions report will be submitted to customer together with the trial samples.
Heat Treatment and Steel Certificate

Send message to this supplier
Mr. Amanda Lin
Tel: 86-769-85308812
Enter between 20 to 3,000 chatacters.
Contact Method
Hitop industrial (HK) co., Ltd
Henan Industrial Zone, JinXia Community, Dongguan, Guangdong, China (Mainland)
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center