Investment Casting Service / Engineering Part / Stainless Steel Casting Parts

Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews

 

Investment Casting Service / Engineering Part / Stainless Steel Casting Parts

 

 

Quick Detail:
 

·         Investment casting part of Valve Fitting parts ;

 

·         Casting process : lost wax method ;

 

·         Material : SUS 304 ;

 

·         Finish : Sandblasting;

 

·         ISO 9001 : 2008 certificated ;

 

·         Chemical composition tested by German spectrometer ;

 

·         NDT (X rays, Dye test etc) available .

 

·         Weight : 0.02-50 kg .

 

 
 
Description:
 
Stainless steel and carbon steel investment casting using precision investment casting process. The investment casting foundry is certificated with ISO9001, PED/AD2000. Industrial involved:valves, pumps, pipe fittings,machine components and other mechanical parts.
The most common material that Winnington cast:

Stainless Steel (70%)

Carbon Steel (20%)

Alloy Steel (10%)

CF8M (SS 316), CF3M (SS 316L),  CF8 (SS 304),CD4MCu, CD4MCuN,ANC20,1.4408,1.4517, 1.4581, 1.4306, 303,  430, 420, 17-4PH, SCS1 
and more

SCS14, SCS16,  SCS13, 1.0619, WCB, S355JR, 1045 , LCC 
and more

CLA12C, ANC2,42CrMo,7Q, 8Q,4140,6150 
and more

 

 

FAQ

1. How long can I get the price?

 

Prices will be quoted within 24 hours after we get your inquiry with detailed information ( including drawings, material, surface treatment,quantity, special requirements,etc).

 

2. How can I get a sample to check your quality?

 

On the case of quotation confirmation.Sample will be free of charge for customer approval, freight collect.

 

3. How long can I expect to get the sample?

 

It depends on, normally 15 days~30 days (including mould making time). Samples will be shipped by DHL, FedEx, UPS, TNT or EMS,ect.

 

4. What about the leading time for mass production?

 

It depends on the order quantity. Normally, 15~40 days after receiving of deposit or L/C. 

 

5. What is your MOQ?

 

We don't have a strict limit, small quantity is also workable.

 

 

Advantages:

 

Capacity

we can put your project on the right machines with the right expertise to give you a quality product on time.

 

Speed

We consistently provide the fastest quotes quotes offered on the industry for machined parts.Our production speeds are beyond compare with many machining jobs being programmed and started on a CNC center the same day the order is received.

 

 Post Processing

Post processing is a standard part of what solid concepts offers.we won't leave you with an unfinished part that you have to send out for secondary operations.We offer anodizing,hand polishing,helicoils,tapping, shot blasting and  so on. we can be your one-stop shop for impeccably finished CNC protype parts.

 

 

Quality

Quality you can count on from the leading experts in the rapid manufacturing industry.whether you are doing CNC work to create master patterns,or limited-run production work,our expert team is here to help you get the job done right!


Send message to this supplier
Mr. Yang
Tel: 86-21-51001621
Enter between 20 to 3,000 chatacters.
Contact Method
NTCMACHINE LIMITED
No.308, LinSheng RD, TingLin Industrial Zone, Shanghai, China (Mainland)
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center