Large Capacity Stone Crushing Production Line In Mining Industry

Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews

The Application of Primary Stationary Stone Crushing Plant used in Mining Industry

 

Configuration of 100TPH Primary Stone Crusher Plant

 

Equipment

Model

Qty (set)

Capacity(t/h)

Power (kw)

Weight (t)

Dimension (mm)

Vibrating Feeder

GZD960*3800

1

100-160

11

5.00

3850×1950×1630

Jaw Crusher

PEV600*900

1

50-120

75

18.00

2290×2206×2370

Jaw Crusher

PEV250*1000

2

20-60

37*2

7.8*2

1550×1964×1380

Vibrating Screen

2YK1848

1

32-276

18.5

6.00

5200×1800×1100

Sand Maker

VSI1145

1

250-360

440

21.00

5100×2790×3320

Belt Conveyor

B1000/B800/B650

6

200-500

7.5/5.5

 

 

 

 

Our primary stone crusher plant mainly refers to the jaw crusher and impact crusher. In the designing of a

crushing plant of any nature and size, to select the right type and size of primary crusher is of great

significance. Generally speaking, this machine is the largest and most expensive single item in the plant; a

mistake in the choice may lead to a full replacement. Therefore, you have to pay close attention when

choosing primary stone crushers. The following tips may be helpful for the selection of primary stone

crusher plant.

 

1. The name, hardness, humidity of material;

2. Pay attention to the hourly, daily or yearly capacity;

3. The discharging granularity or the final particle size of the finished products;

4. Crushing machine type and size;

5. Feeding method.

 

Among the five factors, the first three will almost always be ascertainable at least to a close approximation

before selecting the proper crushing equipment. Sometimes, as when a new crushing plant, 01′ a new

primary crusher set-up, is to be installed at an existing operation, the last three factors will be pre-

established. Otherwise, it is sound practice to consider them as a part of the problem of crusher selection.

The primary crushing setup has something to do with the quarrying or mining operation, and optimal

operating results may finally be realized only by careful adjustment of all equipment selections to the

general plan of operation.

 

In addition, it is worth mentioning that the influence of these several factors is more or less closely linked.

Therefore, you should not discuss them separately, as a change in one of them may result in a complete

replacement of others.


Send message to this supplier
Mr. Wendy Zhao
Tel: 86-21-68798919
Enter between 20 to 3,000 chatacters.
Contact Method
Shanghai Lipu Heavy Industry Company
No.3000,Longdong Road,Pudong District, Shanghai, China (Mainland)
Related Products
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center