Quick Installation Easy Cutting Composite Panel Board For Apartment Residential House

Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews

Quick Installation Easy Cutting Composite Panel Board For Apartment Residentical House
 
1 . Description:
 
Quick Installation Lightweight Composite Panel Board is eco-friendly building material .

It can widely be applied to wall materials of various high and low building.

Such as: bank, office building, hospital, school, hotel, mall, amusement hall, active barrack, old house reconstruction, residence and workshop .
 
2 . Size of composite panel board
 

Name

Size(L*W*T)mm

Weight (kg/m2)

Packing(pcs/m2 20’GP)

Application

EPS Cement sandwich wall panel
 

2270x610x60

45-48

315 pcs /436 m2

Roof, interior wall

2270x610x75

50-53

252pcs / 349 m2

Interior wall

2270x610x90

55-58

207pcs / 287 m2

Interior/exterior wall

2270x610x100

60-65

189pcs / 262 m2

Interior/exterior wall

2270x610x120

65-75

153pcs / 212 m2

Exterior wall

2270x610x150

80-90

126pcs / 175 m2

Exterior wall

 
3 . Usage:  Interior and exterior wall,roof and floor .
 

4 . Technical Data :
 

Technology index

Metal frame and plaster boad

VJ EPS Panel

GRC Board

Gypsum block

Weight

20kg/m2

35kg/m2(60mm thickness)

40kg/m2

45kg/m2

Sound insulation

Almost no

excellent,46dB

normal

poor

Waterproof

poor

excellent

normal

poor

Heat insulation

no

excellent

normal

normal

Anti-impact capacity/Hanging force

no

high impact single hanging force is 50KGS

can impact,good hanging force

can impact,normal hanging force

Decoration difficulty

hard,with limiations

easy and without any limiations

General difficulty

General difficulty

Wall thickness

91mm

60mm,increased interior space

60mm

75mm

Useful life

2-3 years

60-70 years

20-30 years

15-20 years

Material secondary use

no

80% can be used

some available

almost no

Construction efficiency

faster

fast

faster

faster

 

5.The process of installation 

 

1) .Seting the line and carring the bord in position 

2). Sawing board 

3). Sizing 

4). Installation 

5). Correcting,fixing 

6). Grouting and filling starch 

7). Sticking fiberglass mesh 

8). Installing electrical wires and switches 

9).Installing doorcase 

10). Facing coating and wall papers

11).Facing ceramic tiles 

12).Electric apparatus installation

 


Send message to this supplier
Mr. Ellen Dong
Tel: 86-27-82801008
Enter between 20 to 3,000 chatacters.
Contact Method
Hubei Vanjoin Building Co., Ltd.
Floor 14, Golden Block, Poly Champagne International Building, Wuhan, Hubei, China (Mainland)
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center