Diesel Engine Asphalt Mixing Plant For Bitumen / Crushed Stones Project Building 380V 50HZ

Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews

 Diesel Engine Asphalt Mixing Plant For Bitumen / Crushed Stones Project Building 380V 50HZ

 

 

10TPH Bitumen Concrete Mixer SLJ - 10 With 23KW Diesel Engine And 380V / 50HZ Power Supply

10Tons Per Hour Asphalt Mixer SLJ-10

 

Specifications:

 

Productivity

8-10 T / H

Input Minerals capacity

0.30M3/Barrel

Suitable For

bitumen, crushed stones

Oil consumption

6 kg / t

Diesel Engine               

23kw

Generator           

15kw

Bitumen Tank Capacity      

700Kg

Suitable fitting

Tube mainframe           

4.0Kw  

Asphalt Pump             

2.0 Kw 

Stone lifting equipment

3.0Kw

Diesel Pump           

0.55Kw

Dusting blowing fan        

3.0Kw

Blowing fan              

4.0kW

Output Minerals temperature

120°C~180°C

Dimension (LxWxH)

4600 X 2300 X 3400mm

Weight

5.50 T

 

Operation and Function

 

The user should assign specific people who operate the machine and familiarize 

operation manual basically, and put the machine into project building after adjusting

 it to work regularly.

 

Testing and preparation work before use

 

a. Start cylinder motor, the tube is transferred, reverse cycle several times to check 

whether their operation is normal or any un-normal aspects.

b. Lift the hopper, raise and down it again and again to make sure each component 

of every engine flexible and reliable, up and down smoothly, the hopper door open 

and close freely and position fixedly.

c.Start all the ventilation blowers to inspect if there is any air leak inside the middle 

pipe.

d. Inspect all bolts fasten or not, especially the gasket ring, reducer bearings, 

furnace body bearings, supporting roller bearings, and other parts.

 

Whole set trial before production

 

a. Filled the hopper with the mineral, asphalt tank should fill with hot asphalt 

(asphalt temperature must above 160 ), the diesel oil tank filled with diesel oil.

b. Asphalt supply value adjustment:

Needed time=  needed time     X   60 (second)

c. Drying time set: due to temperature, moisture level of mineral aggregate, the 

impact of factors such as temperature and drying time required in a certain range 

adjustment may generally be adjusted in 200 to 260 seconds.

d. Mixing time settings: general mixing time set around 60 seconds, can be uniform 

mixing.

 

Natural operational procedure

 

Generator output 380V, 50HZ three phase alternating current 

Inspect each phase position of electric motor to evaluate if it is up to the mustard

Check the asphalt temperature reach 170  or not, so that asphalt pump can spray.

After inspection, start the dust abatement draft fan, burning draft fan, then start 

cylinder and keep it running at the parch direction.

Start lifter, pour inert solid into tube, discharge the hopper.

Start the diesel pump, then press the ignition start, open oil pipe switch, after a few 

seconds to see whether the firing was successful, if unsuccessful, start the blower 

fan button, if not succeed, close the diesel pump and oil pipe switch, after 3 minutes 

do it again. 

g. When drying time arrived, stop diesel pump, the asphalt electric motor start by

 itself at the same time. Put hot asphalt into the cy

Send message to this supplier
Mr. Kane Chu
Tel: 86-27-87747760
Enter between 20 to 3,000 chatacters.
Contact Method
Wuhan Kudat Industry Trade Co., Ltd.
Room 401 E1 Building, Optical Valley Software Park, Wuhan, Hubei, China (Mainland)
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center