Low Pressure PLC Control PU Foam Injection Machine For PU Wood Furniture

Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews

Low Pressure PLC Control PU Foam Injection Machine For PU Wood Furniture

 

 

Parameters

 

Model HC-202  
Tank volume 250  

Motor speed of pouring head /

rotation speed

8600r/min
8600
 
Speed of mass meter pump  Adopt invertors for circle control  
Raw Materials temperature and pressure control controled by PLC programe  
pouring head display screen color 7'HMI display screen, (19.7L X 14.2 H, in cm)  
Remote controller

Saving and monitoring temperature of raw materials, pressure, flow

rate, and speed of metering pump

 


 
Total Power 16W  
Heating Mode Electric heating (4.6 KW)  

 

  • Air compressor (max air press 8kg/cm2), long enough air pipe(6.5*10mm)with connectors.
  • Electricity source: 380V/50Hz. Three Phase five lines.
  • Raw material:A(POLY), B(ISO) and MC clean agency.
  • Moulds and release agency.
  • Lift equipment: According to the client’s need. 

 

Electrical control system

 


1. Fully controlled by SCM (Single Chip Microcomputer)


2. Using PCL touch screen computer. Figures of temperature, pressure, rotation speed are

    all displaying in PLC screen.


3. Alarm function with acoustic warning.

 

 

PRODUCT INTRODUCTION


1.  Two day tanks for Raw Material A(Pol) and B(ISO). Tanks can be added according to your

     componenets. If your products needs colorant, then three day tanks can be realized.


2.  Employing PLC central control system, Automatic calibrate metering pump, real time data saving and

     inquiry, bilingual language program displaying corresponding values for temperature, pressure, 

     rotation speed, and proportion.


3. Mixture head's main shaft can reach 8600 r/min, saving raw material and production costs,

    reducing wash times, improving production effiency and ensuring products quality.


4.Tank adopts double layers for temperature insulation, which ensures raw materials in your    

   expected temperature, saving energy and electric;

 

5. Material hoses and pipelines are employing Thermal conductive insulation layers for ideal

   temmperature for materials circulation, realizing the raw materials have constant temperature

   during conveying process.

 

 

Picture of Low Pressure Injection Machine in our workshop:

 

 

 

After services:
 
1. How long will your engineer reach our factory?
    Within one week after machine arrival your factory.


 2. How many days will you finish installing?
   For low pressure and high pressure injection machines, 10 days will be enough for our technicians to

   complete the equipment installation, erection, start-up commissioning and personnel training.

   For PU molding machine, mold carriers, and sandwich panel production lines, 25 to 30 days are

   necessary for our technician to complete the assembly, installation, erection, start-up commissioning

   and personnel training.


 3. What would be charged for your engineers to inst

Send message to this supplier
Mr. Lydia Shing
Tel: 86-755-3766356
Enter between 20 to 3,000 chatacters.
Contact Method
HuizhouHeChen Mechanical Equipment Co.,Ltd.
Huahan Tech. Industry Zone, Shenzhen, Guangdong, China (Mainland)
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center