Skidded Equipment For Wastewater Treatment Of Mobile Operation

Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Skidded Equipment for Wastewater Treatment of Mobile Operation Overview Drilling sewage treatment equipment integrates such functions as sewage destabilization,Website:http://www.dhpetrotools.com, oil-water separation, solid-fluid separation, and sewage purification by using new sewage treatment technology combining the chemical and physical methods, thus to effectively purify the drilling sewage of oil field, significantly reduce the discharge of pollutants, and realize the pre-treatment, standard reinjection or discharge of drilling sewage.  Structure description Main feature of the equipment is that main containers and pipelines contacted with sewage are made of fiberglass. The Green Shield skidded fiberglass drilling sewage treatment equipment can provide different process flows according to the different conditions on the drilling field and different purposes of sewage treatment; therefore, the structure and equipment provided are different; generally, the treatment equipment mainly comprises pump house, air floatation tank, settling tank, agent tank, primary pool, and filter. The pump house is set with one sewage lift pump, four dosing pumps, one dissolved air tank, and one air compressor; the rotary sludge scraper is set above the air floatation tank, and mixers are provided above agent tanks; one water feeding pump and one backwash pump are equipped for the filter, and one water feeding pump is equipped for the filter tower; the static mixers are connected to the outlet of lift pump in series to evenly mix and fully react the agent and sewage. The water feeding, dosing, mixing, destabilizing and flocculation, air floatation and deslagging, sedimentation and mud discharging, filtration and purification can be carried out in sequence during the operation as per the design requirements.  2.1 Equipment parameters  The treatment capacity of equipment is 6~12.0m3/h, the average sand content of slag mud separated by the equipment is ≤55%, which may be disposed in a harmless way after solidification. The water treated by the equipment may be discharged after meeting the standard requirements. See Table 1 for basic parameters of equipment.  2.2 Structural performance characteristics  ◆ It is in skidded structure, and all unit devices are set in one rectangular frame to form an integrated whole;  ◆ It has simple operation and management, high degree of automation and treatment efficiency, and low cost;  ◆ It can reduce the discharge of drilling pollutants, control the environment pollution, treat and recycle the drilling effluent, and meet the cleaner production requirements for drilling.  Main Technical IndexesLevel of Treated Water QualityEquipmentItemPHSS mg/LPetroCOD crVolatile PhenolChromium VITotal ChromiumScope of ApplicationLevel IIntegrated air floatation and sedimentation deviceInlet water4-10≤500≤100≤100001.0≤1.5≤10Pre-treatment feeding systemOutlet water6-9≤300≤30≤15000.5≤0.5≤1.5Level IISkidded filterInlet water6-9≤300≤30≤15000.5≤0.5≤1.5Standard reinjection safe formationOutlet water6-9≤150≤10≤10000.5≤0.5≤1.5Level IIIAbsorption and oxidization filter tower at grade DInlet water6-9≤150≤10≤10000.5≤0.5≤1.5Standard DischargeOutlet water6-9≤150≤10≤1200.5≤0.5≤1.5
Send message to this supplier
Ms. Wan Lily
Tel: 86-0393-8915988
Enter between 20 to 3,000 chatacters.
Contact Method
Puyang Donghao Mechanical & Electronic Co., Ltd
Middle of Jintian Road,Puyang, Henan, P.R China, Puyang, Henan, China (Mainland)
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center