Damping Cushion Polyurethane Casting Machine Mix Head SCM Fully Controlled

Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews

 

Damping Cushion Polyurethane Casting Machine Mix Head SCM Fully Controlled

Low PressureMetering Machine for polyurethane elastomer machine used making Elastomer tube

 

 

Mix head

 

Mixing by agitator for better mixing performance

New-designed pouring valve for precision dosing, high degree of vacuum ensures no visual cellular

Color additive available

Individual controller for mix head

 

Metering Unit

 

High precision, low speed positive displacement gear pump

Variable output and matching adjusted by inverter

Coupling connect pump and motor, seal by DOP

 

Components Storage and Temperature Conditioning

 

Jacketed tanks with visual level tube

Digital pressure gauge for control and visualization of pressure with max. alarm value

Electrical resistance heater for temperature conditioning operation

Low speed agitator for even temperature distribution

 

Electrical Control System

 

Fully controlled by SCM ( single chip microcomputer )

OP7 operating panel, easy to use, have function of machine parameter setting, pouring time, temperature and cleaning control

Alarm function with acoustic warning

 

Model Output(1:1)g/s Tank(L) Power(KW)
Min. Max. Prepolymer MOCA
BL(E)-1 200 800 120 30 17
BL(E)-5 1000 5000 150 30 19
BL(E)-10 3000 8000 220 40 23
BL(E)-15 5000 15000 220 40 26
BL(E)-25 8000 24000 300 40 33

 

 

 

   
4.

 

 

 

 

Taken the after-sales service and technical support

1. provide free technical guidance equipment installation and debugging.

2. equipment warranty for 12 months.

packaging & Shipping

Packaging Details: steel frame with plywood panel

Delivery Details: 125 working days after received deposit

 

Our Services

Engineers avalible to service machinery overseas.

 

 

 

Other Terms
 
1. Payment terms
The buyer should pay the prepayment of T/T 30% of the total amount and the left 70% of total amount should be paid to the seller by T/T
 
2. Delivery time
The producing time is 20 work days after receiving 30% deposit.
 
3. Inspection
Inspection place is the seller’s factory.
 
4. Force - majeure circumstances
Due to force majeure the contract may be terminated automatically.
 
5. Ownership
The ownership of the above mentioned products transfer from the seller to the buyer at time of delivery. If the buyer shall not pay, the ownership of the products belongs to the seller.
 
6. Arbitrage
All disputes and disagreement that may arouse in connection with the present Contract, both sides of the present Contract could solve by negotiation firstly, or else both sides can go to “Qingdao Arbitration Commission” for a fair solving result.


Send message to this supplier
Mr. Mr. Jack
Tel: 86-532-83228684
Enter between 20 to 3,000 chatacters.
Contact Method
Qingdao Ecorin Polyurethane Machinery
Liaoning Road, Jiaozhou Beiguan Industrial Zone,undefined, Qingdao, Shandong, China (Mainland)
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center