Thermal Oil Heated Mobile Asphalt Batch Mixing Plant With Schneider & Siemens Components

Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews

Thermal oil heated mobile asphalt batch mixing plant with Schneider&Siemens components

 

One by one location and installation of batch mobile asphalt plant.

 

Step 4,

Make mineral powder tank semi-trailer in assigned position,locate.hoist mineral powder tank car to the reference position by a 25T craneconnect metering screw conveyer(219)to mineral powder weighing hopper,mount mobile support of metering screw conveyer,install pneumatic butterfly valve and softconnect.

 

Step5, 

Make cold aggregate supply system semi-trailer in assigned position,adjust the adjustable landing leg outside to the specified height,unfold rest landing leg,locate cold aggregate supply system carunfold collective conveyer belt,lock up to certain angle,keep the height and length,send cold aggregate from outlet of collective conveyer belt into dryer and feeder belt inlet of hoisting system semi-trailer.

 

Step6,

Make asphalt storage tank system semi-trailer in assigned position,adjust the adjustable landing leg to the specified height,connect the pipeline between oiling asphalt pump and main building,and keep steady state.

 

Step7,

Locate the asphalt heating system semi-trailer to the assigned position,adjust landing leg to specify height,and connect hard wired pipeline and 2 soft wired pipeline to the asphalt storage tank car .Lift the overhead tank on top of frame,connect the pipeline between overhead tank and low tank.

 

Step8, 

Locate the air compressor,connect the gas pipelines between air compressor and main building,and connect airpipe of each electronic gas box.

 

Step9,

Locate the control system mobile unit to the assigned position,connect electric wire of each part,and main power.

 

Check allocation and connection of the sub-units one by one

Check allocation and connection of all parts. Prepare for other task before discharging.

 

Transportation of Batch Mobile Asphalt Plant.

Transport speed should be in accordance with fixed one in equipment.

 

Type QLB-Y1000 QLB-Y1500 QLB-Y2000
Rated production 80ton per hour(mixed material 160) 120ton per hour(mixed material 160) 160ton per hour(mixed material 160)
Raw aggregate hopper Volume/No. 8M3/4 10M3/4 10M3/4
Mixing tank capacity More than 1000kg/batch More than 1500kg/batch More than 2000kg/batch
Drum dryer Φ1540*6800mm Φ1840*8100mm Φ2000*8860mm
Fuel type Diesel/mazut/LPG/Coal powder Diesel/mazut/LPG/Coal powder Diesel/mazut/LPG/Coal powder
Hot storage bin 20T/4 25T/4 25T/4

Mixed asphalt

Temperature

130-165 130-165 130-165
Dust removingmethod gravitational dust collector & Second baghouse dust collector gravitational dust collector & Second baghouse dust collector gravitational dust collector & Second baghouse dust collector
Asphalt tank volume 20M3 30M3 30M3
Blackness of exhaust gas Ringelmann I Ringelmann I Ringelmann I
Operation room noise ≤70db(A) ≤70db(A) ≤70db(A)
Environment noise ≤80db(A) ≤80db(A) ≤80db(A)
Heat conduction oil furnace 300,000kcal/h 300,000kcal/h 500,000kcal/h
Total Installation Power ≈200kW ≈310kW ≈56KW

 

 

 

 


Send message to this supplier
Mr. Mr. Jia Wang
Tel: 86-510-85361108
Enter between 20 to 3,000 chatacters.
Contact Method
WUXI XITONG TECHNOLOGY GROUP
No88,Xuedian South Road, New District, Wuxi, Jiangsu, China (Mainland)
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center