hangar stockage building and Prefab Steel workshop wind-resistance

Price: 1000.0 USD
Trade Term: FOB
Payment Terms: L/C
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • Brand Name: HX 
  • Top client Serviced: SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil 
  • Quality Control: The third party, SGS, ASIA INSPECTION all accept 
  • Specifications:: Wall&Roof: EPS, Rock wall, PU sandwich, corrugated steel sheet 
  • Main structure: Welded H section,Lattice structure,Tubular column or beam,space frame etc 
  • Welding standard: AWS D1.1 
  • Model No.: 1-705 
  • Place of Origin: Shandong  
  • Min.Order: 100 Metric Ton
  • Means of Transport: Ocean
Supply Capacity
  • Production Capacity: 8000 Ton/per Month
  • Packing:sea worthy packing
  • Delivery Date: 30 days

1. Typical Surface treatment for hangar stockage building ( made of steel frame ) :

Surface Treatment

Hot dip galvanize 

Standard : JIS , DIN , ASTM B695 - 2000

Hot dip galvanizing hole cutting good looking on surface

Galvanizing process :

Steel structural components → Degreasing → Rinsing→ Pickling → Rinsing →

Fluxing → Galvanizing → Quenching → (Passivation) → Inspecting → Finished Product


Paint

1 . Primer paint one coat 20 - 30 um

2 . Middle paint two coat 40 - 60 um

3 . Finish paint one coat 20 - 30 um

Paint type : 1 . red primer  2 . zinc primer  3 . Alkyd primer

 

 

2. We are specialized in design and production of prefab steel building, heavy Structure, workshop& warehouse etc. :

 

We have a strong technical team. We have 960 employees, 80 of them are professional designers and engineers with rich experience in designing and producing. Base in our good management, good quality and excellent after selling service, we got ISO9000, 14000, 18000 by BV France, AWS welder, EN welder, CE certificate, SGS. It brought much business chance to us.

Depending on our professional engineers, most of our products got the design patent. Therefore, our products are not only welcomed by our homeland customers, but also popular among many foreign countries, such as Australia, Qatar, Iran, Sudan, Angola and East-south Asia, Middle East and other regions, etc.

 

3. Project case- Heavy Structure Steel Welding Fabrication for New Zealand, 5900 tons:

 

Port: Tianjin

Place Of Origin: China

Brand Name: HX

Model Number: OEM And Design

Application: Industrial Usage

Production: H beam, Purlin, Bracing, Bolts

Price: USD 1200 / Ton

Delivery Time: 86 Days

Price Condition: FOB Tianjin Port

Packaging Details: In Seaworthy Packing

Package Weight: 5900tons

 

4. Drawings & Quotation for the hangar stockage building ( made of steel frame ) :

1) Customized design to welcome.

2) As long as you like, we can design and provide drawings for you. Just give the technical data and your demand, we will give you the best offer.

3) In order to give you an exactly quotation and drawings, please tell us the Length, width, eave height and local weather.  We'll quote for you prompt.

 

5. Our seaworthy packing system for hangar stockage building ( made of steel frame ) :

 

We found mature exporting packing and stuffing system:

With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.

 

To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.

 

6. FAQ:

1) What kind of company you are ?

We are steel structure building Manufacturer located in Shandong China, We were gaining good reputation among our customers for our professional, warm and thoughtful service. Because we know that a long terms business based on the quality control, price, packing, delivery time etc.

 

2) Does your company is a factory or trade company ?

We are factory, so you will enjoy the best price and competitive price. The price of hangar stockage building ( made of steel frame ) is composed of the quotation for steel structure, wall and roof panel. It has absolute price advantage for its low manpower cost, short building period and low requirement on building site even the material cost is high in comparison to the building with the traditional material.

 

 



Send message to this supplier
Mr. zhang (Vice General Manager)
Tel: 86-543-2127969
Enter between 20 to 3,000 chatacters.
Contact Method
Shandong Huaxing Steel Structure Co., LTD.
Boxing County, Binzhou, Shandong, China (Mainland) / 256500
Fax: 86-543-2127069
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center