prefabricated modular commercial buildings made of steelstruct outdoor

Price: 1000.0 USD
Trade Term: FOB
Payment Terms: T/T
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • Brand Name: HX 
  • Top client Serviced: SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil 
  • Certificates: EN-1090 CE certificate, American CWI, European TWI, European IWE 
  • Material Grade: Chinese Q235& Q345B 
  • Drawing Design: by client or by us 
  • Shipment by: Container or bulk ship 
  • Model No.: 1-942 
  • Place of Origin: Shandong  
  • Min.Order: 100 Metric Ton
  • Means of Transport: Ocean
Supply Capacity
  • Production Capacity: 10000 Ton/per Month
  • Packing:sea worthy packing
  • Delivery Date: 30 days

1. we can give you a quotation for the prefabricated modular commercial buildings ( made of steel frame ) if you offer this :

A : Customers have the drawings

we can provide you the accurate quotation and full service of production , shipment and installation guide , which is high quality and low cost . Because we own all kinds of technical facilities , complete test instruments and advanced production process .

B : Without drawings

Our excellent design team will freely design the light steel structure warehouse , workshop and other steel buildings for you . If you give the following information , we will give you the most satisfactory price and drawings .

1 . Dimension : Length , width , height etc .

2 . Doors and windows : Dimension , quantity , position .

3 . The material on the roof and the wall .

4 . Local climate : Wind speed , snow load , seismic load , temperature etc .

5 . If you have other requirements , please also inform us .

 

 

2. Our Products Scope:

1) Steel Structure for industrial and power fields, such as power plant, steel mill, solar industry, hydroelectric plant, petrochemical fields, oil and gas pipeline, etc.

2) Steel Structure for civil fields, like high-rise building, heavy Steel Structure, workshop& warehouse, etc.

 

3. Project case- 10000 tons heavy steel structure for Indian cement plant Project:

Description:

The whole steel consumption of this is more than 10000 tons, Among which, the steel consumption of steel roofing truss for steel structure homogenization silo and structural steel bunker is about 7000 tons.

Raw materials silo, clinker materials silo, electricity dust removal, pre-heater and other structures, together with steel structure buildings for subsidiary equipment, total steel structure components reach approximately 3, 000 tons.

 

4. Our service for the product of prefabricated modular commercial buildings ( made of steel frame ) :

1) We provide free design and technical support work: according to the plan, size requirements, use function and load conditions provided by the owner; we will provide free architecture scheme drawings, component detail drawings, installation instruction drawing, installation instructions files.

2) Coordination in product transportation

We' ll track products' transportation in whole course, and actively help customers solve all problems during product transportation.

3) Installation guidance

If our customer needs, we will assign engineers for on-site installation guidance work.

 

5. Our seaworthy packing system for prefabricated modular commercial buildings ( made of steel frame ) :

 

We found mature exporting packing and stuffing system:

With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.

 

To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.

 

6. FAQ:

1) Q: How long is your delivery time for prefabricated modular commercial buildings ( made of steel frame ) ?

A: Generally it is within 15-30 days after get the deposit and final drawing, definitely according to quantity and your requirements of prefabricated modular commercial buildings ( made of steel frame ).

 

2) Q: What is the colors of your sandwich panels usually used ?

A: Off-white, ivory white, blue, green and red color.

 

3) Q: How can I get the quotation of the project ?

A: If you have drawing, we can offer you the quotation as per your dwgs. If you have no design, Our engineer make your idea to real warehouse and will design some drawings for you to confirm. And then offer you a quotation under your material demand and drawing.

 

 

 


Send message to this supplier
Mr. zhang (Vice General Manager)
Tel: 86-543-2127969
Enter between 20 to 3,000 chatacters.
Contact Method
Shandong Huaxing Steel Structure Co., LTD.
Boxing County, Binzhou, Shandong, China (Mainland) / 256500
Fax: 86-543-2127069
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center