commercial metal storage buildings made of stell frame multi-span nice made

Price: 1000.0 USD
Trade Term: FOB
Payment Terms: T/T
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • Brand Name: HX 
  • Top client Serviced: SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil 
  • Software used: RamConnection Midas/Gen 
  • Drawing Design: by client or by us 
  • Surface Treatment: painted with international paint 
  • Welding standard: AWS D1.1 
  • Model No.: 1-696 
  • Place of Origin: Shandong  
  • Min.Order: 100 Metric Ton
  • Means of Transport: Ocean
Supply Capacity
  • Production Capacity: 3000 Ton/per Week
  • Packing:Panel accessories will be packaged in wooden box
  • Delivery Date: 30 days

1. Our excellent design team will design the commercial metal storage buildings ( made of steel frame ) for you . If you give the following information :

1 ) Data for design

   Wind speed ( KM /H )

   Snow load : ( KG / M2 )

   Rain load ( KG / M2 )

   Earthquake load if have

   Demands for doors and windows

   Crane ( if have ) , Crane span , crane lift height , max lift capacity , max wheel pressure and min wheel pressure !

 

2 ) Material quality

   Windows and doors quantity , size and location

   Roof and wall material , sandwich panel or corrugated steel sheet ( steel sheet can not heat insulation ) 

 

3 ) Type

    Size -- width , length , eave height and roof slope

   Single slope or double slope

   Single floor , double floor or multi floor

 

2. About us:

Founded in Shandong province, we have been engaged in construction field for more than 14 years. Today we have become a company integrating R & D, design, production, sales, installation and service. Our main products range from steel structure, steel workshop, warehouse, prefab steel building, ( color coated and galvanized corrugated) steel sheet ( for roof, wall) , sandwich panel ( EPS, PU, Rock Wool, glass wool) , C, H, Z section steel and also other building materials.We have more than 10 independent production lines.

 

Our products are mainly used as the workshop, warehouse, office and accommodation in such fields as construction, petroleum, water conservation, exploration, mining, military, traffic, urban construction, house and government procurement. With the advanced manufacturing technology, excellent product quality, complete product types, outstanding sales and service team, our product sales network covers both at home and abroad. We have also participate in many important projects in China and abroad including Beijing 2008 Olympic Games, China 60th anniversary of national parade village project, Sichuan Quake Relief and so on. Our products have been exported to more than 80 countries and regions like UAE, Saudi Arabia, Iraq, Ethiopia, Sudan, Angola, Equatorial Guinea, Gabon, Zambia etc.

 

3. Project case- Description of Hengda steel structure workshop building:

The axis area for this steel structure workshop building is 19578m2

Axis dimension is 180m, 108m, the eave height is 14.15meters.

The primary member is Q345B, all are sand-blasting,

The surface treatment quality required meets GB 8923 SA 2 1/2 Grade

Painting is two coats of anti-corrosive primer and two alkyd finish

Crane runway girder is equipped in each span, install 32mt and 16mt overhead crane

 

4. Drawings & Quotation for the commercial metal storage buildings ( made of steel frame ) :

1) Customized design to welcome.

2) As long as you like, we can design and provide drawings for you. Just give the technical data and your demand, we will give you the best offer.

3) In order to give you an exactly quotation and drawings, please tell us the Length, width, eave height and local weather.  We'll quote for you prompt.

 

5. Our seaworthy packing system for commercial metal storage buildings ( made of steel frame ) :

 

We found mature exporting packing and stuffing system:

With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.

 

To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.

 

6. FAQ:

1) How can I install these commercial metal storage buildings ( made of steel frame ) together as a building after cargo arrived ?

Normally, most clients choose to install the steel building structure frame themselves or ask local technical engineer for further instruction.

If local technical support is not available or cost too much, we could also provide technical support engineer cross over-seas for installation guide even with our installation engineering team.

 

2) How to maintain my commercial metal storage buildings ( made of steel frame ) years of using ?

commercial metal storage buildings ( made of steel frame ) are built for long-time, reliable, steady usage purpose, the maintenance process is easy to operate and complete, most our product can live 10-15 years with minimal maintenance work like gel filled and paint spray. We will keep tracking the usage performance of our products and provide maintenance instruction for our clients.

 

 



Send message to this supplier
Mr. zhang (Vice General Manager)
Tel: 86-543-2127969
Enter between 20 to 3,000 chatacters.
Contact Method
Shandong Huaxing Steel Structure Co., LTD.
Boxing County, Binzhou, Shandong, China (Mainland) / 256500
Fax: 86-543-2127069
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center