commercial metal framing building made of steel column construction on sale

Price: 1000.0 USD
Trade Term: CFR
Payment Terms: T/T,L/C
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • Brand Name: HX 
  • Top client Serviced: SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil 
  • Software used: RamConnection Midas/Gen American SAP2000 
  • Drawing Design: dwgs Detailing by us 
  • Service Offered: Design, fabrication, packing, transport, erection 
  • Shipment by: bulk ship Shipment: 20'GP, 40'GP, 40'HQ, or in bulk 
  • Model No.: 1-895 
  • Place of Origin: Shandong  
  • Min.Order: 50 Metric Ton
  • Means of Transport: Ocean
Supply Capacity
  • Production Capacity: 10000 Ton/per Month
  • Packing:sea worthy packing
  • Delivery Date: 30 days

1. Technical specs for the commercial metal framing building ( made of steel frame ) :

Item name

Material characteristics

Material Grade

Surface Treatment

Anchor bolt

Steel rod M24 , M27

Q235B


Steel Column

H shape , Box , steel pipe , Hot rolled sheet

Q235B , Q345B

Paint or Hot dip galvanized

Steel Beam

H shape , steel Truss , Hot rolled sheet

Q235B , Q345B

Paint or Hot dip galvanized

Steel Bracing

Steel rod , Steel pipe , Angle steel

Q235B , Q345B

 Paint

Steel Purlin

C or Z shape , steel purlin Thickness :1.8mm ~ 3.0mm

Q235B , Q345B

Hot dip galvanized

External wall panel , Roof panel

Sandwich panel with EPS , Rock wool , Pu , Glass wool 

Steel T = 0.426 ~ 0.8mm , insulation T=50 ~ 150mm

Alu-zinc galvanized then painted

Door

Sliding or rolling door

Steel or Aluminum sheet , T = 1.0 ~ 1.5mm 

Paint or Hot dip galvanized

Window

alloy-Glass , Aluminium alloy - shutter

T = 1.0 ~ 2.0mm

Alloy

Day-lighting panel

FRP , T = 1.5mm or T = 1.8mm

Coefficient of thermal expansion : 2.2 x 10 - 5 / cm

Light transmittance 85%

Ventilator

Turbine ventilator, ventilator along a slope

Steel , stainless steel , PC

Paint , 304

Gutter

Galvanized Steel plate , stainless steel plate

T = 2.0mm

Paint , 304

Downpipe

PVC pipe , T = 0.5mm

Φ110 , 160 , 200


Bolt

Ordinary , high strength

10.9S , 4.8s

Bluing for high strength bolts

 

 

2. About us:

We are a modern steel structure building enterprise specialized in engineering design, manufacture, installation and service of steel structures; and its manufacturing base is situated in Shandong, China. Due to customers' trust and constant innovation of our team, the enterprise is now with a total area of 360, 000 m2 as regards our plants.

 

We have passed ISO9001: 2000 International Quality System Certification and has a level-one qualification of steel structure project specialized contracting. The enterprise has been verified by BV and SGS which are two global largest verification organizations.

 

The business scope of us are various steel building, such as steel structure workshop, warehouse, multi-storey building, prefab steel house, container steel house, high-rise frame building and frame structure for large equipment, etc. We also supply various steel structure materials, such as H-type steel, color steel sheet, C-type purlin, Z-type purlin, floor deck as well as steel beam and steel column.

 

3. Project case- South Africa Light Pre-engineered Building, 7000SQM, 2011:

South Africa workshop project

usage: steel pipe production workshop

length 252M X width 27.5M X height 11M, with a crane of 30 ton, the crane sling height is 7M. The workshop adopt Frame bent structure, lattice form column. Roof and wall surface is single steel sheet, no heat insulation, the bottom of wall has brick wall that 800 mm height and aluminum windows that 1.8m height, skylight sheet on roof for lighting.

Client issue the order to us within 1 week after visit our factory, our hardware and ISO management system leave deep impression to them. Now, we have finished more than 6 orders for this client.

 

4. How we ensure the high quality of commercial metal framing building ( made of steel frame ) :

After years of exploration, practice and improvement, our company has built an experienced technical team in steel structure. Every project is supposed to go through the following procedures:

1) Owing plasma cutting, flame cutting, available to provide multiple cutting service.

2) Well-experienced engineer team and production team for steel structure fabrication, welder working with CWI certificate, according to WPS( welding procedure specification) and PQR( procedure qualification record) .

3) Professional non-destructive testing, fully equipped.

4) Professional surface treatment: sandblasting, paint spraying, powder coating as per American standard.

5) More than 10 years steel structure fabrication experience

6) Full set of manufacturing process plan to ensure delivery on time.

 

5. Our seaworthy packing system for commercial metal framing building ( made of steel frame ) :

 

We found mature exporting packing and stuffing system:

With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.

 

To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.

 

6. FAQ:

1) Q: How could I control the cost of building a commercial metal framing building ( made of steel frame ) ?

A: Firstly, the designing scheme should be mutually discussed and then accepted. Then, the kinds of building materials should be confirmed since different types and qualities make various prices. After that, we will send you a detailed quotation.

 

2) Q: How Long does it take to build a commercial metal framing building ( made of steel frame ) ?

A: It depends on the size of the warehouse. Generally, the construction period of is 1 month of a 2000-square-meter workshop by a construction team of 8-10 people. It only costs 2-3 weeks to build the steel structure frame.

 

3) Q: Is it difficult to build a commercial metal framing building ( made of steel frame ) ?

A: totally not, you can let your local teams build it according to the construction drawings and erection guiding video provided by us.

 

 



Send message to this supplier
Mr. zhang (Vice General Manager)
Tel: 86-543-2127969
Enter between 20 to 3,000 chatacters.
Contact Method
Shandong Huaxing Steel Structure Co., LTD.
Boxing County, Binzhou, Shandong, China (Mainland) / 256500
Fax: 86-543-2127069
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center