steal buildings and pre engineered steel building with ISO for Abuja client

Price: 1000.0 USD
Trade Term: FOB
Payment Terms: L/C
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • Brand Name: HX 
  • Surface Treatment: Painted by Zinc rich paint 
  • Drawing Design: dwgs Detailing by us 
  • Top client Serviced: SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil 
  • Certificates: 1. ISO9000, ISO14000, ISO18000 by BV France. 2. EN-1090 CE certificate, American CWI, European TWI, European IWE 
  • Service Offered: Design, fabrication, packing, transport, erection 
  • Model No.: 1-315 
  • Place of Origin: Shandong  
  • Min.Order: 100 Metric Ton
  • Means of Transport: Ocean
Supply Capacity
  • Production Capacity: 3000 Ton/per Week
  • Packing:Bolts and accessories loaded into wooden box
  • Delivery Date: usually as customers'order

1. components and materials of the steal buildings ( made of steel frame ) :

Main structure

Welded H section , Lattice structure , Tubular column or beam , space frame etc

Purlin

C Section Channel or Z Section Channel

Roof Cladding

Sandwich Panel or Corrugated Steel Sheet with Fiber Glass Wool Coil

Wall Cladding

Sandwich Panel or Corrugated Steel Sheet

Tie Rod

Circular Steel Tube

Brace

Round Bar

Column & Transverse Brace

Angle Steel or H Section Steel or Steel Pipe

Knee Brace

Angle Steel

Roof Gutter

Color Steel Sheet

Rainspout

PVC Pipe

Door

Sliding Sandwich Panel Door or Metal Door

Windows

PVC/Plastic Steel/Aluminum Alloy Window

Connecting

High Strength Bolts

Packing

Decided by you , loaded into 1X 40ft GP , 1X20 ft GP , 1X40 ft HQ

Drawing

We can make the design and quotation according to your require or your drawing

 

 

2. Our Factory:

We were founded and located in Shandong Province, China. We have fixed assets of 180 million RMB and a workshop plant area of more than 200, 000 Square meters. Our manufacturing base covers 360, 000 square meters. In addition, we have more than 960 employees, including 110 intermediate and senior technical staff members. Besides, we have our own installation and construction teams. We also have abundant financial resources and advanced equipment, including H-TYPE and BOX-TYPE steel structure production lines, full-range impeller blasting equipment, production lines of rack and truss, C-TYPE and Z-TYPE steel forming machines, various kinds of machine tools, drilling machines, folding machines and physical and chemical detection equipment.

 

3. Project case- Heavy Steel Structure Building in Qingdao, 60, 000 SQM:

The Project - metallurgical automatic transmission equipment assembly base steel structure project. Located in Qingdao China High-tech Zone, total span is 120 meters, total length is 198.1 meters; eave height is 13.2 meters; the ridge height is 18.6 meters.

1) Trims,flashing: color steel sheet;

2) Gutter: color steel sheet;

3) Downpipe: PVC;

4) Door: sandwich panel door;

5) Window: Aluminium window( single glass)

This project is the national important investment project, the government, 3rd party QC consultant and the owner track the quality and progress very strictly in the whole process, finally they are satisfied with our quality and performance, and issue 5% extra bonus for our one month advance delivery which save them too much cost and make their production beginning earlier.

 

4. We found international surface treatment system for the steal buildings ( made of steel frame ) :

We got NACE 1 and 2 level certificate as per American standard.

We build professional enclosed shot blasting workshop, enclosed sand blasting room, 34000m2 fully-enclosed painting workshop and 20, 000 m2 enclosed packing workshop.

 

5. Our seaworthy packing system for steal buildings ( made of steel frame ) :

 

We found mature exporting packing and stuffing system:

With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.

 

To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.

 

6. FAQ:

1) What will client provide before factory offers good quotation ?

A: When we receive inquiry from client, client need to fills purchasing intention sheet, providing us with information of steel workshop dimensions, draft drawing, wind load etc for prefabricated steel building. We will design the drawings and offer competitive quotation with the above information.

 

2) What are main materials of steal buildings ( made of steel frame ) ?

A: Its materials mainly include light steel structure, sandwich panel, roof tile, door, window, covers, screws and other accessories.

 

3) Could you please design a new and unique steal buildings ( made of steel frame ) for me ?

A: Absolutely! We are able to provide you with construction scheme

and structural drawings as per your specific demand and favors. Besides, detailed drawings and 3Dmodels are surely included. One-stop service is our outstanding superiority with no doubt.

 

 



Send message to this supplier
Mr. zhang (Vice General Manager)
Tel: 86-543-2127969
Enter between 20 to 3,000 chatacters.
Contact Method
Shandong Huaxing Steel Structure Co., LTD.
Boxing County, Binzhou, Shandong, China (Mainland) / 256500
Fax: 86-543-2127069
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center