steal frame formed tyson metal buildings multi-functional to Malabo market

Price: 1000.0 USD
Trade Term: FOB
Payment Terms: T/T
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • Brand Name: HX 
  • Top client Serviced: SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil 
  • Quality Control: The third party, SGS, ASIA INSPECTION all accept 
  • Service Offered: Design, fabrication, packing, transport, erection 
  • Main structure: Welded H section,Lattice structure,Tubular column or beam,space frame etc 
  • Welding standard: AWS D1.1 
  • Model No.: 1-46 
  • Place of Origin: Shandong  
  • Min.Order: 50 Metric Ton
  • Means of Transport: Land
Supply Capacity
  • Production Capacity: 3000 Ton/per Week
  • Packing:Components will be packaged by steel pallet
  • Delivery Date: 15 to 40 days



1. Technical specs for Steel building ( made of steal frame ) :

 

Specification

Structure type

Heavy steel structure

Design standard

AISI / ASTM / BS / DIN / GB / JIS

Length

With customer's requirement

Width

Single span , double-span , multi-span

Height

With customer's requirement

Components

Bolt

Steel grade 45

Column

Q235B , Q345B welded H section steel

Beam

Q235B , Q345B welded H section steel

Tube

Steel Q235B ,  Q345B

High strength bolt

Cr 40 , 10.9S , 9.8S , galvanization

Sleeve

Steel Q235B , Q345B , galvanization

Purlin

Q235B C channel or Z channel , galvanization

Roof & Wall panel

Sandwich panels , Corrugated steel sheet , FRP sheet

 

 

2. Who we are:

We are an integrated and professional steel building & steel structure provider in Shandong China. Specialized in the fields of steel structure building manufacturing and international business, Based the principle of sincerity, credit, mutual benefit and rich resources from China we have provided best quality products and value-adding service to customers for more than 15 years. As return, we won top reputation and established long-term business relation with customers from more than 50 countries and regions. Our customers are very satisfied with our good reputation, efficient working system, good service for resourcing, inspection, loading, installation guidance and claim solving.

Our top serviced client include SIEMENS, GE, India Adani Power, Hyundai Steel etc.

 

3. Project name: Pakistan Ceramic Tile Factory, 2015, 49050 m2:

Location: Pakistan

Area: 49050m2

Project time: the year of 2015

This workshop is used for ceramic tile production, all use steel frame with an area of 49050 m2. Main materials are as following:

Steel truss: Q345B

Column: Q345B

Roof & wall purlin: galvanized Z280X75X20X2.5

Horizontal bracing: 25 round steel

Wall cladding: corrugated steel sheet+glass wool+corrugated steel sheet

Roof cladding: corrugated steel sheet+glass wool, skylight panel, ventilator

Door: electric rolling door, electric sliding door

 

 

4. Payment Terms & Delivery for Steel building ( made of steal frame ) :

Payment: L/ C or by T/ T( 30% prepaid as deposit, balance 70% before shipment)

Delivery time: 15 to 40 days, usually as customers' order

Shipment: 20' GP, 40' GP, 40' HQ, or in bulk

 

5. Packaging & Shipping for Steel building ( made of steal frame ) :

1) Using container:

container of 20 feet, and container of 40 feet

2) By sea for batch goods, for container or bulk-cargo ship, port receiving.

3) Customers specifying freight forwarder or negotiable shipping methods

4) All of the steel column& beams ends and plates will be packed by the blanket to protect them from the crash in the container during the shipment.

5) To make the loading and unloading more efficiently and saving the delivery cost, 40' OT is preferred to loading the steel frames.

6) All the wall and roof panels will be filmed by two sides and fixed stably in the 40HQ container.

7) All the windows and doors will be protected by the bubble rapping papers and fixed stably in the container.

 

6. FAQ:

1) Do you offer service for installation ?

Re: We will give detailed installation drawings and direction info for free. And if you need, we could also send engineers as installation director even a team.

 

2) What should I provide to build a Steel building ( made of steal frame ) ?

A: So easy! Design drawing would be a better reference for us. However, you will

never mind if you don't have any. Simply notify us your requirements, such as the

area, wind load, usage of the warehouse etc. Before long, you' ll possess an amazing design.

If you have any new need, please provide your drawing paper or technical parameter for us reference, we will quote for you more precisely and accordingly.

 

3) Is the Steel building ( made of steal frame ) erection quick ?

Yes, Steel beam, steel column, crane beams, purlins, support, wall beam, they are prepared in a factory, they are installed only need to connect with bolt on site, this installation is quick and convenient, Only need to provide the installation drawings.

 

 



Send message to this supplier
Mr. zhang (Vice General Manager)
Tel: 86-543-2127969
Enter between 20 to 3,000 chatacters.
Contact Method
Shandong Huaxing Steel Structure Co., LTD.
Boxing County, Binzhou, Shandong, China (Mainland) / 256500
Fax: 86-543-2127069
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center