peb structure fabrication formed steel builings well selling at Nicosia area

Price: 1000.0 USD
Trade Term: CFR
Payment Terms: T/T
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • Brand Name: HX 
  • Top client Serviced: SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil 
  • Welding standard: AWS D1.1 
  • Design& quote: We can make design and quotation according to your require or your drawing 
  • Main structure: Welded H section,Lattice structure,Tubular column or beam,space frame etc 
  • Specifications:: Column&Beam: Welded or Hot rolled H-section 
  • Model No.: 1-198 
  • Place of Origin: Shandong  
  • Min.Order: 100 Metric Ton
  • Means of Transport: Ocean, Land
Supply Capacity
  • Production Capacity: 8000 Ton/per Month
  • Packing:sea worthy packing
  • Delivery Date: 30 days

1. Products description for the Steel building ( made of peb structure fabrication ) :

Main Steel

Steel Beam Column

Q235B , Q345B

Secondary Steel

Tie Bar

Q235B

Purlin

C and Z purlin

Bracing

Q235B

Accessories

Surface

Painted or Hot Dip Galvanized

Door

Rolling Up Door or Sliding Door

Window

PVC or Aluminum Alloy

Roof and Wall Panels

Corrugated Steel Sheet , EPS Sandwich Panel , Rock Wool Sandwich 

Panel , PU Sandwich Panel

Others

Service

Design , Fabrication and Installation

We can offer quotations according to customers' drawings and requirements , free design drawings and detailed installation drawings .

Design software :  Auto CAD , PKPM , MTS , 3D3S , TArch , Tekla Structures ( X steel ) V12.0 , etc

Packing

main steel frame with 40 OT 

roof and panel load in 40 HQ 

Or According To Customer Requirement

 

 

2. Our Products Scope:

1) Steel Structure for industrial and power fields, such as power plant, steel mill, solar industry, hydroelectric plant, petrochemical fields, oil and gas pipeline, etc.

2) Steel Structure for civil fields, like high-rise building, heavy Steel Structure, workshop& warehouse, etc.

 

3. Project case- Structural Steel Logistics Warehouse:

This logistics warehouse is constructed for Hidu, it' s located in Qingdao, China, total area is 40, 000m2.

Our company takes 22 days in total to finish the area of 20,000m2, it' s a miracle in this field of steel structure construction, and we got high reputation from our customer.

1) Roof use V760 type 0.6mm steel sheet with 75mm glass wool and attaching veneer.

2) Wall use V840 type 0.6mm steel sheet

3) Skylight panel on roof

4) Ventilator on roof

 

4. Trial Assemblies to ensure smooth erection of Steel building ( made of peb structure fabrication ) on project site:

Our plant is fitted out with large working areas for major assembly work of steel structures and oversized built-up components

In order to ensure the optimal installation of the steel structures on-site, trial assemblies of various and unique steel pieces with complex geometry forming part of a built-up component, are performed in the plant prior to their delivery to site.  In addition to validating the quality of the design, the compliance with engineering parameters and fabrication accuracy, these trial assemblies add great value for the client since they mean potential time and cost savings with regard to installation work on site.

To successfully carrying out trial assemblies of large steel components, our fabrication complexes have been fitted out with large production areas and state-of-the-art equipment as well as measurement method, which are integrated in Tekla Structures 3D software, thus ensuring the quality control of its products.

 

5. Packaging & Shipping for Steel building ( made of peb structure fabrication ) :

1) Using container:

container of 20 feet, and container of 40 feet

2) By sea for batch goods, for container or bulk-cargo ship, port receiving.

3) Customers specifying freight forwarder or negotiable shipping methods

4) All of the steel column& beams ends and plates will be packed by the blanket to protect them from the crash in the container during the shipment.

5) To make the loading and unloading more efficiently and saving the delivery cost, 40' OT is preferred to loading the steel frames.

6) All the wall and roof panels will be filmed by two sides and fixed stably in the 40HQ container.

7) All the windows and doors will be protected by the bubble rapping papers and fixed stably in the container.

 

6. FAQ:

1) What type of drawing of your steel building will your factory supply ?

A: Plan drawing, elevation drawing, sectional drawing, foundation drawing, installation drawing.

 

2) Is there any warranty available on the Steel building ( made of peb structure fabrication ) ?

Answer: It have usually 2 years' warranty. Usually, we build the warehouse complied with the GB Chinese standard, which is equal to U.S. building codes.

 

 

3) What if I have questions during the installation of your Steel building ( made of peb structure fabrication ) ?

Answer: Our Steel Structure company has a technical service department ready to answer your questions and help you through the process of installing the prefabricated warehouse. if you need, we could also send engineers to your site to help you.

 



Send message to this supplier
Mr. zhang (Vice General Manager)
Tel: 86-543-2127969
Enter between 20 to 3,000 chatacters.
Contact Method
Shandong Huaxing Steel Structure Co., LTD.
Boxing County, Binzhou, Shandong, China (Mainland) / 256500
Fax: 86-543-2127069
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center