steal frame pre structured building systems reduce foundation cost

Price: 1000.0 USD
Trade Term: FOB
Payment Terms: L/C
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • Brand Name: HX 
  • Service Offered: Design, fabrication, packing, transport, erection 
  • Software used: AUTOCAD 3D3S PKPM Tekla STAAD-Pro 
  • Certificates: 1. ISO9000, ISO14000, ISO18000 by BV France. 2. EN-1090 CE certificate, American CWI, European TWI, European IWE 
  • Installation: Provide full set of construction drawings and video to direct installation; 
  • Top client Serviced: SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil 
  • Model No.: 2-046 
  • Place of Origin: Shandong  
  • Min.Order: 50 Metric Ton
  • Means of Transport: Land
Supply Capacity
  • Production Capacity: 9000 Ton/per Month
  • Packing:Panel accessories will be packaged in wooden box
  • Delivery Date: 15 to 40 days

1. Typical Surface treatment for Steel building ( made of steal frame ) :

Surface Treatment

Hot dip galvanize 

Standard : JIS , DIN , ASTM B695 - 2000

Hot dip galvanizing hole cutting good looking on surface

Galvanizing process :

Steel structural components → Degreasing → Rinsing→ Pickling → Rinsing →

Fluxing → Galvanizing → Quenching → (Passivation) → Inspecting → Finished Product


Paint

1 . Primer paint one coat 20 - 30 um

2 . Middle paint two coat 40 - 60 um

3 . Finish paint one coat 20 - 30 um

Paint type : 1 . red primer  2 . zinc primer  3 . Alkyd primer

 

2. Company Brief:

Founded in Shandong, we are one of the most powerful enterprises of steel building and steel structure in China.

Area of Main factory: 360,000 square meters and the 200,000 square meters' workshops.

Total number of staff: 960 persons, details are as follow:

Number of Admin Staff: 140.

Number of Marketing and Sales: 102.

Number of Architectural Designers: 58

Number of In Line QC: 38.

Number of regular workers for production and installation of Steel building ( made of steal frame ) : 600

We have the experience to do the big projects with the top rank construction company in the world, we are always showing our best service and professionalism, and we have exported the steel structure buildings to more than 110 countries.

 

3. Project case- Egypt Structural Steel Pre-engineered Building, 4000 SQM:

The workshop is build in 2009, divided into three parts, include materials manage area, flour produce area and storage area, general total area is 4000 square meters. The workshop adopt portal frame, partly adopt three story frame structure; main steel structure is welded H steel, two coats mid―gray paint on surface for rust prevention, galvanized purlin, roof and wall is single steel sheet, shutter windows on the wall for ventilate.

 

4. Fabrication Services for Steel building ( made of steal frame ) :

With the annual output of 200, 000 tons. We have 10 fabrication facility lines equipped with CNC cutting, drilling and milling capabilities. We are staffed with skilled CWI, production planning teams, and experienced steel structure building fabricators and painters. Each of our plants has its own unique strengths and assets, which makes us the optimal choice for any type of steel structure building project or heavy / complex steel structure.

 

5. Packing & Delivery for Steel building ( made of steal frame ) :

For Main Components: Put steel structure components on a steel pallet and tie up the frame part together by packing strap with wood beam and cardboard, then load into container by crane or forklift

For cladding: Plastic film wrap the roof and wall corrugated single steel plate.

but for sandwich panel will load into container piece by piece

This package is to protect the goods from damage, during the transportation.

 

Delivery:

Load into 40/ 20GP, 40HQ, 40OT or Bulk carrier.

Delivery Time: 15 to 30 days after the receiving deposit or according to client' s requirements.

 

6. FAQ:

1) What will client provide before factory offers good quotation ?

A: When we receive inquiry from client, client need to fills purchasing intention sheet, providing us with information of steel workshop dimensions, draft drawing, wind load etc for prefabricated steel building. We will design the drawings and offer competitive quotation with the above information.

 

2) What are main materials of Steel building ( made of steal frame ) ?

A: Its materials mainly include light steel structure, sandwich panel, roof tile, door, window, covers, screws and other accessories.

 

3) Could you please design a new and unique Steel building ( made of steal frame ) for me ?

A: Absolutely! We are able to provide you with construction scheme

and structural drawings as per your specific demand and favors. Besides, detailed drawings and 3Dmodels are surely included. One-stop service is our outstanding superiority with no doubt.

 

 



Send message to this supplier
Mr. zhang (Vice General Manager)
Tel: 86-543-2127969
Enter between 20 to 3,000 chatacters.
Contact Method
Shandong Huaxing Steel Structure Co., LTD.
Boxing County, Binzhou, Shandong, China (Mainland) / 256500
Fax: 86-543-2127069
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center