Calorized&Ceramic Coated Pipe | ||||||||||||||||||||||||||||||||||||||||||
(1) Minimum Consumption The calorized layer and the refractory coating layer together generate the strong heat resistance and anti-oxidation to achieve minimum consumption of lance pipe to cut down your cost. (2) Superior Quality Strict quality control is made at each production process over the raw materials to the finished products. (3) Economical Price Low price with high quality is achieved through mass production at our most advanced factory. | ||||||||||||||||||||||||||||||||||||||||||
USES: | ||||||||||||||||||||||||||||||||||||||||||
(1) Cutting steel scrap, melting and refining steel at electric arc furnance. (2) Injection of carbon, lime powder and/or other additives for adjusting grades of carbon steel or special steel. (3) Removing slag inside oxygen converter. (4) Other uses which require strong resistance against heat, oxidation, sulfuration, vanadium attack, etc. | ||||||||||||||||||||||||||||||||||||||||||
|
Home >
Minerals & Metallurgy
>
Iron & Steel
>
Steel
>
Steel Pipes
>
EAF Calorised&Ceramic Coated Oxygen Lance Pipe open furnace tap holes
EAF Calorised&Ceramic Coated Oxygen Lance Pipe open furnace tap holes
Price: | 5.0 USD |
---|---|
Trade Term: | FOB |
Payment Terms: | T/T |
Trade on HiSupplier, Worry Free Guarantee
•Trading safety, secure your money, lower the risk, protect both buyers and suppliers
•HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
- Product Details
- Company Profile
- Product Reviews
Basic Info.
- ASTM: A53-A/B;A106-A/B;A120;A134;A139
- JIS: STB340;STPT370;STS370;STPB340;STB370;G3452SGP;STPY400;
- GB/T: 9948;8163;3092;10#;20#;Q235
- Certification: ISO9001-2008
- Technique: ERW
- Application: Foundry Casting,Cutting and Smelting
- Model No.: CACC-33.4
- Place of Origin: Jiangsu
- Min.Order: 1000 Piece/Pieces
- Means of Transport: Ocean
Supply Capacity
- Production Capacity: 90000pieces/month
- Packing:seaworthy package strapped bundle wrapped inplastic
- Delivery Date: 15-30days
Didn't find what you're looking for?
Post Buying Lead or
contact our customer service specialist for help!