350m Deep Crawler Mounted Drill Rig Multifunctional Dth Borehole

Price: 6800.0 USD
Trade Term: FOB,CFR,CIF,DAT,FAS,DDP,DAP,CIP,CPT,FCA,EXW
Payment Terms: T/T,L/C,D/A,D/P,WU,Paypal,Money Gram
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • Price :: A detailed discussion 
  • Payment Terms :: L/C, D/P, D/P, T/T, Western Union 
  • Supply Ability :: 10000sets/year 
  • Packaging Details :: Wooden case or naked 
  • Power type :: Diesel 
  • Drilling Depths :: 350 meters 
  • Drilling Hole Diameters :: 105-305 mm 
  • Voltage :: 220V/380V 
  • Length of drill pipe(mm) :: 3m 
  • Feature :: High Drilling Efficiency 
  • Place of Origin: Hebei  
  • Min.Order: 1 Set/Sets
  • Means of Transport: Ocean, Air, Land
Supply Capacity
  • Production Capacity: 10000 sets per year
  • Packing:Standard Export Package
  • Delivery Date: Within 7-15 days

Pneumatic Drilling Machine Introduction


Pneumatic Drilling Machine geothermal well multi-purpose drilling rig is a lightweight, efficient and versatile drilling equipment. It has the advantages of advanced structure, convenient use, high work efficiency, high reliability and good durability. It is widely used in wellbore applications such as drilling wells, agricultural irrigation wells, geothermal air conditioning wells, etc. It is especially suitable for mountain and rock formation water intake projects. Equipped with rubber crawler self-propelled for easy movement.


Pneumatic Drilling Machine Technicals


Model

350 Meters Pneumatic Drilling Machine

Drilling depth

350m

Dia.hole

φ105-305mm

Advance Length one time

6.6m

Working pressure

1.7-3.3MPa

Air consumption

17-35m³/min

Length of rod

1.5m,2m,3m, (6m can be choosed)

Dia. Of rod

φ89,φ102,φ114

Lifting power

24T

Rotation torque

6200-8500 N.m

Rotation Speed

55-115r/min

Diesel Engine

Yuchai

Engine Power

85Kw/2200rpm

Travelling speed

0-2.5 Km/h

Climb capacity

30°

Weight

9000kgs

Dimension

5500x1900x2780mm

Application

Complicated geological conditions: Rock, Mud, Sand etc.

Drilling Way

Top drive hydraulic rotary and propulsion, Dth Drilling or Mud Pump Driling

DTH Hammer

4",5",6",8",10" Drill hammer or CIR110, 130, 150,170




 350 Pneumatic Drilling Machine FAQ

1. It has different models used for water well drill rig,mine blast hole drill,underground drill project,,etc
2.T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
3.Generally, it will take 7 -10 working days after receiving your advance payment.
The specific delivery time depends on the items and the quantity of your order.
4.Our main machine enjoys a 1 year warranty(except for the hammer), during this time all accessories
broken can be changed for a new one.And we provide videos for machine install and operation.


Oil Filter Element Replacement


1. Unscrew and discard the oil filter.

2. Clean the filter shell by self suction and dredge the front and rear differential pressure through holes.

3. Check whether the differential pressure transmitter is normal.

4. Fill the new filter element with oil and apply a layer of oil on the sealing ring of the filter element.

5. When installing the filter element, screw it until it contacts the sealing gasket, and then manually tighten it by 1 / 3 turn.

6. After startup, check whether there is leakage.


Warning on safety precautions of water well drilling rig


Warnings on safety precautions that must be read and understood by all operators and maintenance personnel of the drilling rig:
1. Before repairing the drilling rig, first close the main air inlet pipe and empty the air path.
2. When the traveling motor is started, pay attention to the forward and backward speed of the drill. When towing, do not stay or walk between the two machines
3. When connecting and removing the drill pipe, the spindle of the rotary head must rotate slowly to prevent the fork and the J-shaped wrench from slipping and rebounding;
4. The jack is only used for leveling the drilling rig and loading and unloading during transportation. It is strictly prohibited to deal with stuck drilling accidents.
5. When the drilling rig is displaced, the drilling rig can only be moved when the carriage is completely upright and fixed with bolts or the carriage is completely flat.



Send message to this supplier
Mr. jilei
Tel: 86-311-66792900
Mobile: 18633074135
Enter between 20 to 3,000 chatacters.
Contact Method
Hebei Nailiang Machine Equipment Co., Ltd.
No.585 Tianshan Street, Gaoxin Zone, Shijiazhuang, Hebei, China (Mainland)
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center