Wheels Mounted Gk 200 Engineering Drilling Rig Mobile Equipment Diesel Power

Price: 6800.0 USD
Trade Term: FOB,CFR,CIF,DAT,FAS,DDP,DAP,CIP,CPT,FCA,EXW
Payment Terms: T/T,L/C,D/A,D/P,WU,Paypal,Money Gram
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • Price :: Negotiation 
  • Payment Terms :: T/T, Western Union 
  • Supply Ability :: 2000 sets per year 
  • Packaging Details :: Standard Export Package 
  • Power Type :: Diesel 
  • Weight: 626KGS 
  • Drilling depth: 150 Meters 
  • Voltage: 380V 
  • Rated Boring Diameter: 200m 
  • Place of Origin: Hebei  
  • Min.Order: 1 Set/Sets
  • Means of Transport: Ocean, Air, Land
Supply Capacity
  • Production Capacity: 20000 sets per year
  • Packing:Standard Export Package
  • Delivery Date: Within 7-15 days

Wheels Mounted GK 200 Mobile Easy Operation Engineering Drilling Rig Equipment



GK 200 Engineering Drilling Rig Introduction


The drilling rig is applicable to the engineering geological survey of industrial and civil construction, railway, hydropower, transportation, bridge, dam foundation and other buildings; Geological core drilling and physical investigation; Drilling of small grouting holes, geothermal holes, blasting holes and various concrete detection holes; Small water well drilling and small foundation pile hole.


GK 200 Engineering Drilling Rig Tech Information


Drilling depth

200m
Maximum open hole caliber300mm
End hole caliber75mm
Drill rod caliber60mm
Drilling angle90°~75°
Drill weight (No include power)975kg
Unity machine dimensions1433×697×1273m
Spindle
spindle speed64 128 287 557r/min
Spindle stroke450mm
Winch
Max.single line hoisting capacity2400kg
Single line lifting speed0.41,0.82,1.64m/s
steel wire rope caliber13m(35m)
Mud pump
TypeHorizontal single urn twin-action
Displacement

170/150L/min(diesel or electromotor)

Diesle engineZS1115 16.2kw 2200r/min
Electric motorY160M—4 11kw 1440r/min


GK 200 Engineering Drilling Rig Advantages


1) It has a hydraulic feeding structure to improve the drilling efficiency and reduce the labor intensity of workers.

(2) The drilling rig is equipped with upper ball clamp clamping mechanism and hexagonal active drill pipe, which can reverse the rod without shutdown and is easy to operate.

(3) It is equipped with a hole bottom pressure gauge to indicate the pressure, which is convenient to master the situation in the hole.

(4) The handle is centralized and easy to operate.

(5) The base is equipped with an oil cylinder, which can move back and forth for easy lifting and lowering of drilling tools

(6) The drilling rig has the advantages of compact structure, small volume, light weight, strong decomposition and easy relocation. The loading form is trailer type, crawler type and disassembly. It is suitable for working in plain or mountainous areas.


What is the best time to do soil sampling?


Soil samples can be taken any time throughout the year. It is important though to sample approximately the same time of the year. Late summer, or early fall, is a good time for most crops. This allows time for lime recommended to react and change the pH before the crop is planted

The specific steps of soil sampling method are as follows:

1. Distribution: samples shall be taken according to the soil type and the distribution of crop varieties, and according to the different soil fertility. The sampling points are distributed in zigzag or snake shape, which should be as uniform and random as possible.

2. Determine the sampling position and depth: the sampling position and depth shall be determined according to the thickness of the cultivated layer. Generally, the sampling depth is 0-20cm


Soil Sampling Procedure


Divide the field into different homogeneous units based on the visual observation and farmer's experience.

Remove the surface litter at the sampling spot.

Drive the auger to a plough depth of 15 cm and draw the soil sample.

Collect at least 10 to 15 samples from each sampling unit and place in a bucket or tray.

If auger is not available, make a 'V' shaped cut to a depth of 15 cm in the sampling spot using spade.

Remove thick slices of soil from top to bottom of exposed face of the 'V' shaped cut and place in a clean container.

Wheels Mounted Gk 200 Engineering Drilling Rig Mobile Equipment Diesel Power


Send message to this supplier
Mr. jilei
Tel: 86-311-66792900
Mobile: 18633074135
Enter between 20 to 3,000 chatacters.
Contact Method
Hebei Nailiang Machine Equipment Co., Ltd.
No.585 Tianshan Street, Gaoxin Zone, Shijiazhuang, Hebei, China (Mainland)
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center