REINFORCEMENT ROAD MESH

Price: 1.0~2.0 USD
Trade Term: FOB
Payment Terms: T/T,L/C,WU
skype
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • Application: Others 
  • Type: Woven 
  • Material: Others 
  • Brand Name: wanhai 
  • Mesh Size: 60x80mm,80x100mm,100x120mm,90x110mm 
  • use: rock fall protection,Coastal Protection,Roads and Pavements,Slope Revetment 
  • wire: galfan ZN-5%AL coating wire,PVC coated hot dipped galvanized wire 
  • standard: ISO9001,SGS,ASTMA97597,EN 10223 standard. 
  • application: Control and guide of water or flood 
  • Model No.: WHMP-HEXNETTING10 
  • Place of Origin: Hebei  
  • Min.Order: 10 Set/Sets
  • Means of Transport: Ocean, Air, Land
Supply Capacity
  • Production Capacity: 5000sguere mater
  • Packing:pallet packing,or nude packing.
  • Delivery Date: 15days
REINFORCEMENT ROAD MESH is manufactured from double twisted steel wire mesh with transverse reinforcing rods.
The DOUBLE TWIST STEEL WIRE MESH size is 80 by 100 mm (nominal), the wire is protected against corrosion by a zinc coating, The mesh thickness varies between the 2.4 mm wire diameter up
to 9.2 mm where the transverse rod passes through the double twist.The ROAD MESH APPLICATIONS
Road Mesh
was initially introduced to intercept the reflected cracks generated by
jointed concrete pavements. Wider use of the product and further research have found
the steel mesh being used more widely and for a greater number of solutions.
The steel mesh is best suited to be used for the following applications:
- Fatigue cracking and overlays: if a new pavement or if a new overlay is installed
over a fatigued/cracked pavement, cracks will propagate to the surface after a very short
traffic period. Road Mesh is introduced to extend the life of the overlay by absorbing
the horizontal tensile stresses resulting from the existing cracks and by traffic loads.
- Road widening: when roads need to be widened, differential settlement cracks
occur at the junction between the old and new pavement structures. Road Mesh is
introduced to bridge the junction to absorb the crack stresses caused by the differential
settlement: the effective interlock with the asphalt aggregate matrix ensures the
optimum contribution of the reinforcement; a minimum of 1 m either side of the joint is
required.
- Surface rutting: under repeated heavy vehicle traffic, the asphalt surfacing is
exposed to repeated shear forces which result in shear slip circles and ultimately leads
to shoving. Road Mesh is installed at the base of the overlay, for a layer thickness more
than 60 mm, thus intersecting the shear slip circle and ultimately reduces the surface
rutting.

Send message to this supplier
Ms. lucy (manager)
Tel: 0086-318-8090311
Mobile: 13833816502
Enter between 20 to 3,000 chatacters.
Contact Method
ANPING COUNTY WANHAI METAL PRODUCTS TRADING CO., LTD.
(10-1-202) JINDIYAYUAN AREA HEPING STREET ANPING COUNTY, Hengshui, Hebei, China (Mainland) / 053600
Fax: 0086-318-8090311
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center