Size | DN200 |
WT | STD |
Standard | ASME B 16.9 |
Material | A234 WPB,A234 WP1,A234 WP5,A234 WP11,A234 WP12,A234 WP22,A234 WP91,WB36,A420 WPL3,A420 WPL6,A350 LF2,A350 LF3,A105,A515 GR.60,A515 GR.70,A516 GR.60,A516 GR.70,MSS SP75 WPHY42/46/52/56/60/65/70/80,A860 WPHY42/46/52/56/60/65/70/80,A694 F42/46/52/56/60/65/70/80 ,20#,16Mn,Cr5Mo,12Cr1MoV,15CrMo ST37.0,ST35.8,ST45.8,S235JR,P235GH ASTM A106 GR.A,ASTM A106 GR.B,ASTM A53 GR.B API 5L GR.B,API 5L X42/46/52/56/60/65/70/80, A182 F304/F304L/F316/F316L/F321/F347 A403 WP304/WP316/WP321/WP347 |
country of origin | China |
Brand | GEE |
technics | heat treatment |
connection | welding |
qualification | ISO9001/API/CE/BV/ABS/The famous trademark of china |
Advantages | 1) High quality and competitive price 2) Direct Manufacture 3) OEM offerd 4) Reliable supplier and good after-sales service 5)delivery in time. 6) year-round supply 7)Large orders will enjoy a discount |
Surface Treatment | black rust-proof oil,transparent oil,hot galvanizing or as customer's special requirem |
Application ranges | Petroleum, power, gas, metallurgy, smelting, foodstuff, papermaking, chemical,medical equipment, aviation, boiler heat exchangerand other fields. |
Home >
Construction & Decoration
>
Pipe & Fittings
>
Pipe & Fitting Accessories
>
DIN carbon steel straight tee
DIN carbon steel straight tee
Price: | 5.0~999.0 USD |
---|---|
Trade Term: | CIF |
Payment Terms: | T/T,L/C,WU, |
Trade on HiSupplier, Worry Free Guarantee
•Trading safety, secure your money, lower the risk, protect both buyers and suppliers
•HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
- Product Details
- Company Profile
- Product Reviews
Basic Info.
- Shape: Equal
- Technics: Forged
- Type: Tee
- Material: Carbon Steel
- Connection: Welding
- Brand Name: GEE
- Technics: Forged
- standard: DIN
- material: ASTM A234 WPB MSS-SP-75 ASTM A420 WPL3 WPL6
- WT: STD
- Model No.: DN200
- Place of Origin: Hebei
- Min.Order: 1 Piece/Pieces
- Means of Transport: Ocean, Air, Land
Supply Capacity
- Production Capacity: 1,118,000 Tons / Year
- Packing:as the export standards package
- Delivery Date: Usually within3~ 20 days or as customers require
DIN carbon steel straight tee DN200 STD
Related Products
Didn't find what you're looking for?
Post Buying Lead or
contact our customer service specialist for help!