Product feature:
1. long life.
2. Keep good performance after lightning stroke.
3. Various protection radius.
4. Tracing the lightning in advance and conduct it to the earthcompletely.
5. Auto activation when have lightning and thunder.
6. Artistic outlook.
7. sfety and reliable, without maintenance
Applicationrange:
Petrifaction storage, gas station, buildingconstruction, the beacon Taiwan, the communications station, observatory bases,military bases, the rodar room, bank bulidings.
Petrifaction storage, gas station, buildingconstruction, the beacon Taiwan, the communications station, observatory bases,military bases, the rodar room, bank bulidings.
Installation lightningrod
Installation LY30-Z lightning rod must strictly observe the installation ofthe People;s Republic of China Building mine--mine design standards''(GB50057-94)'' mandatory requirements.
Maintechnical parameters:
The first kid lightning-proof building
LY30-Z Height | H=(m) | ||||||||
5 | 6 | 7 | 8 | 10 | 15 | 20 | 45 | 60 | |
Y30-Z-3.1 | 22 | 22 | 23 | 23 | 25 | 25 | 25 | - | - |
Y30-Z-3.3 | 42 | 42 | 43 | 43 | 43 | 44 | 45 | - | - |
Y30-Z-4.3 | 51 | 51 | 52 | 52 | 53 | 53 | 54 | - | - |
Y30-Z-5.3 | 61 | 61 | 61 | 61 | 62 | 62 | 63 | - | - |
Y30-Z-6.3 | 70 | 70 | 70 | 70 | 70 | 71 | 72 | - | - |
The second kid lightning-proof building
LY30-Z Height | H=(m) | ||||||||
Y30-Z-3.1 | 44 | 44 | 46 | 47 | 48 | 51 | 59 | - | - |
Y30-Z-3.3 | 57 | 58 | 59 | 60 | 63 | 65 | 70 | - | - |
Y30-Z-4.3 | 68 | 69 | 69 | 70 | 73 | 74 | 79 | - | - |
Y30-Z-5.3 | 78 | 79 | 79 | 80 | 82 | 84 | 88 | - | - |
Y30-Z-6.3 | 88 | 89 | 89 | 90 | 92 | 93 | 97 | - | - |
The third kind lightning-proof building
Y30-Z-3.1 | 50 | 50 | 52 | 52 | 55 | 59 | 74 | - | - |
Y30-Z-3.3 | 64 | 67 | 68 | 72 | 75 | 83 | 85 | - | - |
Y30-Z-4.3 | 76 | 78 | 79 | 82 | 85 | 92 | 94 | - | - |
Y30-Z-5.3 | 87 | 88 | 90 | 92 | 94 | 101 | 103 | - | - |
Y30-Z-6.3 | 97 | 99 | 100 | 102 | 104 | 110 | 112 | - | - |