ASTM A53 seamless steel pipe for ship-building

Price: 520.0~1200.0 USD
Trade Term: FOB
Payment Terms: T/T,L/C
skype
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • Standard:: ASTM A106-2006,ASTM 
  • Section Shape:: Round 
  • Port:: Tianjin 
  • Grade: 20#,10#-45# 
  • Place of Origin:: Henan, China (Mainland) 
  • Outer Diameter:: 20 - 900 mm 
  • Certification:: API 
  • Thickness:: 1 - 50 mm 
  • Alloy Or Not:: Non-alloy 
  • Model Number: BT-0121 
  • Model No.: A53 
  • Place of Origin: Henan  
  • Min.Order: 200 Metric Ton
  • Means of Transport: Ocean
Supply Capacity
  • Production Capacity: 1500 Ton/Tons per Month
  • Packing:According to the customer request
  • Delivery Date: 20-30 days
 WT:SCH20 SCH30 SCH 40 SCH80 SCH160
Executive standards:ASME B36.10M---1996 , GB8163---1999GB8162---1999GB3087---1999 , JIS ,DIN

Despite of the above standards, we can also supply seamless steel pipes with standard
Of API 5L---2000, DIN, JIS and so on, and also develop new products according
To the requirements of our clients.

Application:
Seamless steel pipes for low and medium pressure boiler, high pressure boiler, ship-building,
Liquid service, petroleum cracking, chemical fertilizer equipment,
Drawing-oil-equipment and structure purposes.
1.Diameter :15-800mm
2.Wall thickness:1.2-12mm
3.Length:5.8-12m
4.Material:Q235,Q345 Q195,X42-X70

Place of Origin:China   
Material:ASTM A106/A53 GRB

Specification range:
OD:1/4 "---28 " 
the latest price of ASTM A53 seamless steel pipe
Usage
1.  Low and middle pressure fluid transportation pipeline
2.  Casing Tube
3.  Boiler Pipe
4.  Petroleunm and natural gas industry
5.  Chemistry industry
6.  Electric industry
Package
1.  Bundle packing.
2.  Bevelled end or plain end or warnished as per buyer's requestments.
3.  Marking: as per customer's requests.
4.  Painting varnish coating on the pipe.
5.  Plastic caps at ends.
Delivery Time
15-30 days or as clients reqestments.
Supply
1.  seamless steel pipe
2.  ERW welded steel pipe
3.  Stainless steel pipe
4.  carbon steel pipe
5.  hot-rolled steel pipe
6.  spiral steel pipe

ceritificate
ASTM A53 seamless steel pipe for ship-building
the latest price of ASTM A53 seamless steel pipe

Send message to this supplier
Mr. feng
Tel: 86-371-86059106
Enter between 20 to 3,000 chatacters.
Contact Method
Henan Jianhui Construction Machinery CO.,LTD
15F,No.3 Building,Futian Fortune Plaza Hanghai East Road, Zhengzhou, Henan, China (Mainland)
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center