A. ISO-9001: 2000
B. ANSI, ASME, JIS, DIN, BS
C. Supply the best pipe reducer
D. Best price and best.
HEBEI SHENGTIAN PIPE-FITTINGS GROUP Co., Ltd.
Hebei Shengtian Pipe-Fittings Group Co., Ltd. Was established in 1989. We are located in Mengcun County in Hebei Province, covering an area of 100, 000 square meters, with a workshop of 25, 000 square meters and registered capital of $7, 500, 000. We are capable of manufacturing various pipe fittings. Our main products are elbows, tees, bends, reducers, caps, flanges and sockets. We have been in this line for about 20 years. Our products are exported to many countries and regions in Southeast Asia, the Middle East, Europe and America. PRODUCTS
Elbows, reducers, pipe tees, bends, pipe caps
MATERIAL
Carbon steel, stainless steel, alloy steel
We can produce according to materials appointed by consumers.
STANDARD
ANSI, ASME, API5L, DIN, JIS, BS, GB
We can also produce according to drawing by customers.
WALL THICKNESS
Sch5-Sch160 XS XXS STD
Pipe bend Type | BW bend pipe/butt weld pipe bend;SW bend pipe/socket weld pipe bend;Threaded pipe bend/TH bend pipe; Seamless pipe bend/SMLS bend pipe;Welded pipe bend/Welded bend pipe |
Standard | ANSI B16.9, ANSI B16.11, ANSI B16.5; JIS B2311,JIS B2312,JIS B2313,JIS B2316; MSS SP-43, MSS SP-95, MSS SP-75, MSS SP-79; ISO 3419,ISO 5251,DIN 2605 SY/T 0510, SY5257, SH 3408, SH3410 |
Size | 1/2''~48''(Seamless);1/2''~72''(Welded) |
Wall thickness | Sch5~Sch160\XXS |
Radius | R≥3D(R=3D,4D,5D,6D,7D,8D,9D,10D) |
Angel/Degree | 15,30,45,60,90,135,180,etc. according to customer's requirements |
Manufacturing process | Push, Press, Forge, Cast, etc. |
Material Carbon steel Stainless steel Alloy steel | Carbon steel tee, stainless steel tee, alloy steel tee |
ASTM A234 WPB, ASTM A420 WPL6, WPL3; ASTM/ASME A105 WPB; ASTM A106; ASTM/ASME A350 | |
ASTM A403 WP304, A403 WP304L, A403 WP316, A403 WP316L, A403 WP321 | |
ASTM A234 WP12, A234 WP11, A234 WP22, A234 WP5, A420 WPL8, A420 WPL9,ASTM A335 | |
Packing | Wooden cases, pallets, nylon bags or according to the customers' requirements |
MOQ | 1pcs |
Delivery time | 10-100 days depending on quantity |
Payment terms | L/C,T/T |
Shipment | FOB(Tianjin), CFR, CIF etc |
Application | Petroleum/Power/Chemical/Construction/Gas/Metallurgy/Shipbuilding etc |
Remarks | Other materials and drawings are available. |
Welcome to contact us. Hebei Shengtian Pipe Fittings Group Co.,Ltd (22 years manufacturing experience) |