1) Surface: MAT finish(textture) Economic Tooling cost
2)Mould life :1,000,000
2)Mould life :1,000,000
Mould Service | with high qualit y ,long life ,top technic design, prompt delivery, excellent service ,reasonable price |
Technology | adopt CAD/CAM/CAE to design and use advance machines to insure the quality |
Cavity quantity | single or multi cavity |
Cavity /core material | 45#, P20, 718,718H2311, 2738. NAK80,S136 Etc according to clients requirement |
Product material | PA, PP, PE, PET, etc |
mould cycle time | 300,000 to1000,000 times |
2.Machine:
Major equipment | Numbers (set) | Testing Equipment | |||||||||
CNC | 3 | 3D scanner |
| ||||||||
Balancing Machine | 1 | ||||||||||
Wire-cutting | 4 | ||||||||||
Grinding Machine | 2 | ||||||||||
Drilling Machine | 6 | ||||||||||
Fly cutter | 2 |
3.Business flow
1.Quote | According to sample, drawing and specific requirement. |
↓ | |
2.Discussion | Mold material, cavity number, price, runner, payment, etc. |
↓ | |
3.S/C Signature | Approval for all the items |
↓ | |
4. Advance | Pay 50% by T/T |
↓ | |
5.Product Design Checking | We check the product design. If some position is not perfect, or can not be done on the mould, we will send customer the report. |
↓ | |
6.Mould Design | We make mould design on the basis of confirmed product design, and send to customer for confirmation. |
↓ | |
7.Mold Tooling | We start to make mold after mold design confirmed |
↓ | |
8.Mold Processing | Send report to customer once each week |
4. Mould Maintenance
a) When the mould is vacant, spray the anti-rust oil
b) To clean the gate and cooling system regularly
c) Avoid to use recycled material if the mould is suitable for virgin material only
For more information please contact us by Trade Manager or Email.No matter where we are,we'll reply you in 2 days!!!
5. Contact Information:
Mobile: 86-182 5765 6437
Email: starwang2011 (at) gmail(.) com
Skype: purplepromise009
QQ: 1789261590
Skype: purplepromise009
QQ: 1789261590