PPR Long Bypass Bend Pipe Fittings

Price: 0.28~1.0 USD
Trade Term: FOB
Payment Terms: T/T,L/C
skype
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • Head Code: Others 
  • Shape: Equal 
  • Technics: Others 
  • Type: Nipple 
  • Material: PP-R 
  • Connection: Others 
  • Brand Name: OEM 
  • Working Medium: Water 
  • Working Pressure: 2.5MPa 
  • Working Temperature: 95℃ 
  • Specifications: 20mm,25mm,32mm 
  • MOQ: 10 cartons 
  • Color: Green,Grey,White,Blue 
  • Packing: Plastic bags and cartons 
  • Delivery Time: Within 30 days 
  • Payment Terms: L/C,T/T 
  • Port of Loading: Ningbo or Shanghai 
  • Model No.: XM-PPR030 
  • Place of Origin: Zhejiang  
  • Min.Order: 10 Pack/Packs
  • Means of Transport: Ocean, Air, Land
Supply Capacity
  • Production Capacity: 500000pcs/month
  • Packing:cartons
  • Delivery Date: 30 days

PPR Long Bypass Bend Pipe Fittings

***SPECIFICATIONS


PPR Long Bypass Bend Pipe Fittings
Size
Net Weight (g)PCS/CTNMOQ (cartons)
20mm56g22010
25mm67g13010
32mm119g7010


***Application Area:

1. Cold and hot water systems of residence and commercial buildings.

2. Transportation of industrial water supply and chemical materials.

3. Pure water pipe system.

4. Piping networks for rainwater utilization systems.

5. Irrigation systems for gardens.

6. Transportation system of drinking water production.

7. Piping networks for solar plants.

8. Other pipes in industry and agriculture.

***Characteristics of PP-R Pipes

1. Well heat resistance ability

   The pipes can be used for a long time while the working temperature of water is 70°C. They can be used for a short time while it reaches 95°C. The softening temperature is 140°C.

2. Well insulation ability

   The thermal conductivity of PP-R pipe materials is very low compared with steel and copper pipes.

Type of Materials

Thermal conductivity

Unit

PP-R pipes

0.21-0.24

w/mk

Steel pipes

43-53

w/mk

Copper pipes

333

w/mk

3. Long life span

   Under normal conditions of temperature and pressure, PP-R pipes can be used for over 50 years.

4. Little resistance for water flow

   The inner walls of PP-R pipes are smooth and limescale will not be formed there. The wear resistance factor is only 0.007, considerabally lower than the matel pipes. The ability for carrying water for PP-R pipes increases by over 30% than the metal pipes with the same size.

5. Environmental

   During the process of production, construction and use, PP-R pipes will not make any pollution to the environment.

6. Economical

   The price for PP-R pipes is almost the same with the galvanized pipes. With convenient construction, they are more cheap.

7. Light weight

   The density of PP-R pipes is 0.89-0.9g/cm, only 1/8 of the steel pipes, 1/10 of copper pipes. The light weight will reduce the transportation cost and the construction intensity.

8. Healthy

   The materials of PP-R pipes are formed with just two elements, that is, Carbon and Hydrogen. The sanitation performance of the materials has passed the examination by the government authority.

9. Well corrosion-resistance

   Except for few oxidents, the pipes can endure the erosion of many kinds of chemical materials. The pipes will not be rusted, get eroded, breed the growth of bacteria.

10. Little expansion force

   The flexible moludus of PP-R materials is small. So the expansion force formed with the change of temperature is little. They are suited for the installation of inside walls and concealed foor construction.

11. Complete accessories

   PP-R pipe system have a full set of accessories and can meet the requirements of general project.

12. Solid connection

   PP-R pipe system adopts the hot-welding way for connection. The pipes and fittings are linked together The tensile, bending and impact intensity at the interface is bigger than the pipe intensity, avoiding the hidden danger of water leakage.

***WELDING STEPS OF PPE PIPES AND PPR PIPE FITTINGS:

1.Cut pipe 

When you disconnect the pipe, you must use the tube cutter vertical cut, because if there is no tube cutter, use other tools Xiaoduan pipe, after cutting off the head should be cleaned, insert the support sleeve.

2.Heating pipes and pipe fittings 

When the tube is heated to fusion 260 ℃, while advancing the pipes and fittings in the welding device,

and heated to 5 seconds or more. 

3.Connecting pipes and pipe fittings 

The heated vertical pipe and pipe fittings to promote and maintain more than 5 seconds, do not overexert when advancing to 
prevent the tube head bent.

(1).After construction is subject to acceptance pressure test before being sealed tube and use.

(2).Connecting water pipes and equipment should be installed in the device. Pump or fan coil and a receiver box must hose.

(3).When using a hot and cold water pipes, should take into account changes in thermal expansion and contraction.

(5).Insulation measures should not be direct contact between the pipe and the hanger. Hanger spacing shall meet the following
criteria:

(6).PP-R pipe hanger installation spacing

A:Cold water pipe hanger installation maximum spacing

Nominal Diameter20mm
35mm32mm40mm50mm63mm75mm90mm110mm
Horizontal Pipe0.65
0.800.951.101.251.401.501.601.90
Risers1.00
1.201.501.701.802.002.002.002.50

B:Hot water pipe hanger installation maximum spacing

Nominal Diameter20mm
35mm32mm40mm50mm63mm75mm90mm110mm
Horizontal Pipe0.50
0.600.700.800.901.001.101.201.50
Risers0.901.001.201.401.601.701.701.802.00

(6).As for the hot water pipes should increase the contact area between the bracket and the pipe.

(7).Installation location of various types of valves, import and export orientation must meet the design requirements, opening and
closing a flexible, easy to operate.

(8).Fill pipe should be installed on a one-way valve, the highest point of the system should be set to automatically release valve, inlet 
and outlet connections shutoff valve must be installed.

(9).Import and export pumps near the tank should be installed thermometers, pressure gauges, filters and other components too

***OUR WORKSHOP AND PACKING



Send message to this supplier
Mr. Vernon (President)
Tel: 86-574-88251303
Mobile: 13968332861
Enter between 20 to 3,000 chatacters.
Contact Method
DINGDANG INDUSTRY CO.,LIMITED
Room 1102,Huiya International, No.1107 Tiantong North Road, Yinzhou District, Ningbo, Zhejiang, China (Mainland) / 315100
Fax: 86-574-88251303
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center