Galvanized Temporary Bailey Steel bridge

Trade Term: FOB,CFR,CIF,EXW
Payment Terms: T/T,L/C
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • Model No.: HD200 
  • Place of Origin: Jiangsu  
  • Min.Order: 1 Piece/Pieces
  • Means of Transport: Ocean
Supply Capacity
  • Production Capacity: 2500 tons / month

Specifications

1 Used in bailey Bridge Decking System 
2 Galvanized surface 
3 Long-lasting life span 
4 Avoid Being Rusted 
5 High Strength 

Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.

Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.

The compact 200 panel bridge: The compact 200 panel bridge is similar to the compact 100 panel bridge from their appearance. The difference is its increased panel height to 2.134m. It employed the method of alternating joints between Reinforcement Chords and the joints between panels. This method can decrease inelastic deformation caused by the oversized pinholes.  Pre-arch method is used to additionally cut down mid-span and vertical deflection to a larger degree. Bolt-connected components use the orienting sleeve- fixing method to increase accuracy of connections. Shear is created in orienting sleeves and tension is developed in bolts, which increase the usage life of the bolts and ensure the safety of panel bridges. Wind resistant brace is made to be composite type and is connected to transom/girders to improve overall stability of panel bridges. 

The part between braced frame and panels is fixed through bridging so as to prevent the whole bridge from side bending. After the erection, there will be a pre-arched degree over the span of the bridge. Besides it can be assembled into single-lane bridges. The compact 200 panel bridge can also be assembled into double lane bridge, hence it broadens its application range. It is suitable for the load designs of HS-15, HS-20, HS-25 and pedrail-50 etc.

 

Span Construction-Load Table ---Extra Single Lane (W=4200mm)
      SPAN-ftHS-15HS-20HS-25
30SSSSSS
40SSSSSS
50SSSSSS
60SSSSSS
70SSSSSSR
80SSSSRSSR
90SSRSSRSSR
100SSRSSRSSR
110SSRSSRDS
120SSRDSDSR1
130DSDSR1DSR2H
140DSR1DSR2HDSR3H
150TSTSR2DSR2HDSR4H
160DSR2HDSR2HTSR2
170TSR2TSR2TSR3
180TSR2TSR3TSR3H
190TSR3HTSR3QSR4
200QSR4TSR3QSR3 QSR4




Span Construction-Load Table ---Double Lane (W=7350mm)
      SPAN-ftHS-15HS-20HS-25
30SSSSSS
40SSSSSS
50SSSSSSR
60SSSSRSSR
70SSRSSRDS
80SSRDSDSR1
90SSRHDSR1DSR2H
100DSR1DSR2HTSR2
110DSR1DSR2QS
120TSDSR2HTSR2
130DSR2HTSR2TSR3
140TSR2TSR3TSR3H
150TSR3HTSR3HQSR4
160QSR4QSR4QSR4
170QSR4QSR4
180QSR4





1.SS shows one range one tier; DS shows two ranges one tier; TS shows three ranges one tier; DD shows two range two tiers etc.                                          
2.If R follows SS, DS, DD, etc, means reinforce type,and R1 means only one range reinforced, R2 means two ranges reinforced etc.



Send message to this supplier
Ms. lanny (manager)
Tel: 0086-511-86095066
Mobile: 18344717602
Enter between 20 to 3,000 chatacters.
Contact Method
Jiangsu Bailey Steel Bridge Co.,Ltd.
N0.2 Meilinwan Branch Road,Dingmao District, Zhenjiang, Jiangsu, China (Mainland) / 212000
Fax: 0086-511-88881212
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center