YAKE cabinet heat exchanger

Price: 100.0~500.0 USD
Trade Term: FOB
Payment Terms: T/T,L/C
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • Type: Cabinet Air Conditioner 
  • Certification: CE 
  • Brand Name: YAKE 
  • cooling capacity: 1500W: rated voltage:220V/50Hz 
  • Model No.: KJH-25Q 
  • Place of Origin: Guangdong  
  • Min.Order: 5 Set/Sets
Supply Capacity
  • Production Capacity: 5000sets
  • Packing:foam inside, carton outside
  • Delivery Date: 25 days after receive deposit or L/C

Application

 

1. CNC system electric control cabinet, power supply cabinet for electrical process machine tool

 

2. Operation cabinet of heavey machinery

 

3. Telecom, Commuication and progran control exchanger

 

4. All kinds of Measuring Instrument

 

 

Features

 

1. Fully closed air circle system, prevent the dust, gas fog and humid air entering into the control cabine

 

2. Suitiable for electric control cabinets which do not have very strict demand on working temperature

 

3. Working temperature is higher than air dew point ad it has a good environment temperatrure adapability

 

 

Remarks

 

1. The installation place should be capable to stand its weight and transfering force when working

 

2. Prohibit jams at the intake, ensure te distance between the in-outlet and deterence is over one meter, the unit ventilation shouldb be good, otherwise, it will influence the cooling effect and may lead to breakdowm

 

3. The unit should be installed at the place with a good airflow, it is forbiden to have dangerous, flammable and explodable products around them

 

4. The inlet filter must be cleaned once a week, othervise, it will influence the cooling effect and may lead to breakdown

 

5. Dring operating, it should stop working for settlement when something wrong appears, it is not allowed to continue workingwith malfunction.

 

6. Avoid direct sun shining and keee away from heat source

 

7. Be aware of place the water discharge pipe

 

8. After the first one-month operation, you should check carefully every links and tighten parts, it should not be loosed, damaged and so on, only neutral scour can be used t clean the surface of the unti.

 

 



Send message to this supplier
Ms. Susanna
Tel: 86-757-89967062
Enter between 20 to 3,000 chatacters.
Contact Method
Guangdong Yake New Energy Technology Co., Ltd
No. 2 Guanyin Miao Rd, Desheng, Lishui, Foshan, Guangdong, China (Mainland)
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center