Brass / Copper 5 Axis CNC Milling Parts with Anodizing / Sand Blasting

Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews

Brass / Copper 5 Axis CNC Milling Parts with Anodizing / Sand Blasting

 

Our Slogans:

Precision parts processing, mold design and manufacturing,

professional services, customer first!

 

As long as you provide drawings, we can give you perfect products.

We can help you save time and money, contact us quickly,COME ON!

 

How to contact us?

Send your inquiry detail in the below for free sample,click “Contact Now”!


Quick Detail:

Name

die casting parts

Brand Name

HSJ

Finish

Powder Coating/ Electroplating/ Sand Blast

Material

stainless steel

Factory History

8years

Certificate

ISO

 
 
Description:

Various designs and sizes are available 
 
OEM and ODM orders are welcome 
 
Perfect quality and competitive price 
 
Own the independent right of import and export

 
 
Applications
Apply for Auto parts, machinery parts, household parts, light parts, Cooker parts, furniture parts, etc 
 
 
Specifications:

1) (material)

 Carbon steel, Aluminum, Alloy steel, Copper, etc 

2) Surface treatment:

 Zinc plating, Anodization, Chemical fim, Powder, Passivation,etc.

3) Supplying range

Shafts, Sleeves, Rings, Cylinders, Blocks, Modules etc 

4)Process

Casting& Precision Machining 

5) Drawing format:

 pdf/.dwg/.igs./.stp/x_t. etc

6) Production capability

200 Tons per month

7) Inspeciton

100% inspect,QA,OQC,FQC,IPQC

8) Standards

GB, JIS, AISI, SAE, ASTM/ASME, EN, DIN 

9) delivery time

15-20 days after receive despoit

10) delivery place

 shenzhen

 
 

FAQ---
(1). Question---Are you a trading company or factory?
Answer-----We have our own factory.
(2). Question---What`s the production capacity of your company?
Answer---Normally we can reach 200, 000 pcs annually.
(3). Question---How about the delivery time?
Answer---The delivery time will be according to the part quantity, usually the sample will need 7-10 days, and part production will need 25-30 days.
(4). Question---What`s the scrap rate of the part?
Answer---Normally the scrap rate is 3%~4%. However, rejected part will not be delivered to our customers, every item will be 100% inspected by our QC department before shipment.
(5). Question---What should we do if we receive defective product?
Answer---If you have received any unqualified part, please show us the pictures, our engineers and QC department will follow up and repair or redo within 10~15 days according to the rejected quantities.
Thanks for your kind attention, looking forward to your inquiry and we ensure tip top quality products with the best lead-time being provide.


Send message to this supplier
Mr. Krystal
Tel: 86-755-29899839
Enter between 20 to 3,000 chatacters.
Contact Method
Shenzhen Hong Shengji Tech.,
xinger dingfeng technology area,shajing town, Shenzhen, Guangdong, China (Mainland)
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center