1. Material | Aluminium ingot; 6063, 6061, 6082, 6005, T5, T6, |
2. Section Shapes | I, U, T, C, Z, L, H, square, round, flat, hollow, t-slot and other complicated shapes by custom design. |
3. Surface treating | Mill/Anodized(oxidation)/Sand blast/Powder coating/Electrophoresis/Wood grain. |
4. Application | 1) - for Window and door frames |
2) - for Wardrobe cabinet sliding doors, kitchen. | |
3) - for Building curtain glass walls | |
4) - for Solar panel frames, Solar mounting / roofing brackets | |
5) - for Industry assembly lines equipment. | |
6) - for Heatsinks | |
7) - for LED lighting | |
8)- other by custom design size and dimension | |
5. Production lines | 1) 5 melting and casting production lines |
2) 25 extruding production lines | |
3) 6 anodizing and electrophresis production lines | |
4) 2 powder coating production lines | |
5) 4 wooden grain production lines | |
6) 2 heat insulation broken bridge production lines | |
7) 2 wiredrawing and polishing production lines | |
6. Characteristic Services | 1). OEM Service. |
2). Design according to the customers' requirements. | |
3). more years' professional experience in research, manufacturing | |
4). Our modern deep processing center can provide machining such as Cutting, punching, drilling, etc. | |
7. Quality Control | We operate the most strict quality control system, the detection is from the material, production process, |
to final product, and ensure the product quality and traceability. | |
8.Process | Die design→Die making→Smelting&alloying→QC→Extruding→Cutting→Heat Treatment→ |
QC→Surface treatment→QC→Welding→Packing→QC→Shipping→After Sale Service | |
9.Standard | GB5237-2008 equal to EN12020-1.2(2001) |
10.Payment | T/T: 30% for deposit, the balance will be paid before delivery |
11.Delivery Time | 1. 15-35 days production. |
2. If making a mould, plus 7~10 days. | |
12.Packaging Detail: | Inside : packed with plastic film to protect each piece |
Outside: Wrap to be bundles by waterproof craft paper or EPE film. Customized request available | |
13.Lead Time | Die Developing and Sample testing: 12-18 days . |
Mass Production: 20-30days. |