ZLP 500 LP 630 Rope Suspended Platform

Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews

 

 

ISO , CE Approved Temporarily Installed Safe Rope Suspended Platform ZLP500 , ZLP630

 

 

Our factory:

 

Haoke Building Machinery Equipment Co., Ltd. is founded in 2005. It is a leading high-tech enterprise specialized in research, development and manufacturer of electrical suspended

Platform, building hoist and other various kinds of construction equipments. Our products with professional quality, competitive price and fast delivery. We can customized according to your requirements.

 

 

 

Applications:

 

1.Cleaning and maintaining of the exterior wall of high-rise building.

2.Painting, decoration and refurbishing of exterior walls.

3. Installation projects and other construction working of outer walls of high-rise building.

4. Aerial working of ship, large tower, bridge, dams and large chimneys.

5. Install and maintain for high-rise building elevator hoistway, shipbuilding industry, seagoing vessel, warships welding maintain.

 

Specifications:

 

Property /  Model No. ZLP500 ZLP630
Rated load(kg) 500 630
Lifting speed(m/min) 911 911
Motor power(kw) 2×1.5 50HZ/60HZ 2×1.5 50HZ/60HZ
Brake torque(Km) 16 16
Steel rope angle adjusting range(°) 3°- 8° 3°- 8°
Distance between two steel rope(mm) ≤100 ≤100
Rated stretch of front beam(mm) 1500 1500
Suspending platform Locking Aluminum alloy Aluminum alloy
  Nr.Of platform rack Single rack Single rack
  Nr.Of platform 2 3
  L×W×H(mm) (2000×2)×690×1300 (2000×3)×690×1300
  Weight(kg) 350 Kg 375 Kg
Suspending mechanism(kg) 2×175 Kg 2×175 Kg
Counterweight(kg) optional 25×30pcs 25×36pcs
Diameter of steel rope(mm) 8.3 8.3
Max Lifting height(m) 300 300
Motor rotation speed(r/min) 1420 1420
Voltage(v) 3PHASES

220V/380V/

415V

220V/380V/

415V

 

 

 

Main Components:

 

 

 

 

Packing:

 

 

 

 

 


Send message to this supplier
Mr. Celia Wu
Tel: 86-10-52725131
Enter between 20 to 3,000 chatacters.
Contact Method
Shandong Haoke Machinery Equipment Co., Ltd.
Room 1806, Xingchuang Building, Daxing District, Beijing, China (Mainland)
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center