PZ-5B Explosion-proof Shotcrete Machine

Price: 15000.0 RMB
Trade Term: FOB
Payment Terms: T/T,WU,Paypal,Money Gram
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • Brand Name: china coal 
  • Model No.: PZ 5B 
  • Place of Origin: Shandong  
  • Min.Order: 1 Set/Sets
  • Means of Transport: Ocean, Air, Land
Supply Capacity
  • Production Capacity: 1000 sets per month
  • Packing:carton box, plastic bags, wooden cases or as your requirement
  • Delivery Date: 5-10 days after your payment

chinacoal11

we provide service of enterprise's customs declaration, inspection.

Explosion-proof Shotcrete Machine  ,  Shotcrete Machine

,  dry mix spray shotcrete machine 

 

PZ-5B Explosion-proof Shotcrete Machine Product Introduction

PZ-5B Explosion-proof shotcrete machine is a dry concrete shotcrete machine. This kind shotcrete machine uses the compressed air to convey or high-speed jet concrete mix with a certain proportion to the surface through the pipelines. The concrete mix on the surface set and harden to form concrete support layer. In recent years, shotcrete technology with a simple process, an unique effect, the economic cost and fast construction speed, is widely used in construction, rail and road tunnel construction, mine development, slope reinforcement and other fields.

PZ-5B Explosion-proof Shotcrete Machine Main Features 

1. Through type rotary, non-sticky, unobstructed discharge, high efficiency and time-saving.

2. Four-point clamping device makes it easy to adjust the press between sealing plate and rotor disk so as to reduce air and dust leak and prolong consumption parts life., 

3. Using low-tension, high-speed vortex pneumatic transportation, so the spraying flow is even, continuous and steady. It's good to improve the shotcrete quality.

4. The new nozzle, discharge elbow device, improving spray deposition effect, less resilient, high quality shotcrete.

 

PZ-5B Explosion-proof Shotcrete Machine Parameter

 Production capacity: 5m^3/h

 Production capacity: 0.4MPa       

 Conveying distance (level/height): 80/30m 

 Gas consumption: 8m^3/min         

 The largest aggregate diameter: ≤20mm            

 Conveying pipe inner diameter: φ51mm         

 Rotor speed: 11r/min            

 Motor power: 5.5kW

 Voltage levels: ~380/660V

 The mixture ratio of water: 0.2~0.35%              

 Dust concentration:  ≤20mg/m3

 Rail wheel track: 600/762/900mm

 Dimension(Length×width×height): 1530*818*1188(mm)

�Ke1�,/ �!. mso-font-kerning:1px;" >


The operator must read the instruction manual and are familiar with the machine structure and operating procedures before induction operation.

  1. Preparation before starting. 

A.Inspect all components to see whether they are connected securely, each rotary sliding parts are flexible and reliable. 

B. Observe the cursor, check the gear box oil to make sure that it is sufficient. 

C. Drive motor connected to the power. the direction of the turn font should be in the same direction with arrows , otherwise the power supply should be synchronized. 

D. The main gas line, the gas line, under gas line, pneumatic vibrator, sprinklers water shut-off valve should be in the closed state. The main gas line accesses to supply pipe and the water supply pipe accesses to water source, conveying pipe connects to the host.

E. Adjust the clamping mechanism.  Manually pre-pressed, and then uses a wrench to tighten the bend conveying pipe, open the main gas line, shut-off valve on the gas line, observe the pressure gauge at around 0.3Mpa, and the rubber combined board office should no gas spill.

  2. First open the main gas jet operating road, on the gas line, the next gas valve, open the water supply shut-off valve nozzle, pre-wet rock surface, and then start the motor, turn the vibrator pneumatic valves, mixing materials added to the hopper , began spraying operation. Nozzle operator should work properly adjusted sprinkler water supply, protect the material has a suitable water-cement ratio concrete. Host operating personnel should observe the host side I pores, such as more than material discharged under should be properly reduced the amount of gas supply. Until the machine I No material at the discharge port, the device works so far.

  3. Stop operation shut down before the first stop feeding, with no material ejected at the nozzle, turn off the water supply shut-off valve, while adding a small amount to wet gravel hopper, the hopper and rotor material times the cavity of the residual material washed away, with no material ejected at the nozzle, turn off the motor power and the gas shutoff valve.



Send message to this supplier
Mr. mike jiang (sales manager)
Tel: 86-537-2350961
Mobile: 18660761375
Enter between 20 to 3,000 chatacters.
Contact Method
Shandong China Coal Industry and Mining supplies Group Co.,Ltd
No.11, North of Kaiyuan Road, High-tech Zone, Jining, Shandong, China (Mainland) / 272100
Fax: 86-537-2486099
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center