Aluminium concrete wall formwork Professional 6061-T6 for Recyclng Average

Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews

Aluminum Formwork / Aluminum Panels for construction

 

Gowe Group:

 

ZhengXin,as a member of GOWE Group, a collection of R&D ,manufacturing,marketing development and sales,leasing,service, as one of the environmental friendly enterprise organized by industry veteran, is specialized in new type formwork design and implementation.

  

The promoters of the company promote the Green Construction for more than 20 years, made an outstanding contribution in the green recycling using of Chinese infrastructure materials and they led the team to create “Liandong formwork company”, “GoWe Company”, two the company product conforms to the requirement of the time, and a leading domestic and even overseas market in different periods.

 

Professional management team, strong technical force is the basis of ZhengXin; “positive contribute to bonum, sincerity result in far-reaching” is the life fundamental of ZhengXin. On the construction of green environmental protection, for the construction more safety, more beautiful environment, more perfect quality is the new pursuit and mission; we look forward to people who are actuated by high ideals, common progress to realize the industry a bright future.

 

 

Products Advantages:

 

1. High efficience and short period for construction

Aluminum formwork adopt quick assembly and dismantling system. One floor can be finished only for 3-4 days, efficiently reduce ur labour cost and construction period cost.

 

2. High utilization for Recyclng---Average usage is 300 times

 

3. Easy to learn for workers

 

each worker can know how to assemble them through the instructions. One day 30 Sqm for each worker.

 

4.Safe for construction process and big bearing duty

 

5. Perfect walls surface, smooth and beautiful.

 

6. Accuracy and practicability

All construction can be finished though CAD and structural drawings-designing confirming-designing for further confirmed-designing completed.

 

7. Rerecovery value--After regard as useless, can be recycled again and again, thus can reduce the environment and air pollution

 

Comparsion of Aluminum form-work and wood form-work

Material cost (Included Support)

$156-216/m2

$13--16/m2

Turnaround times

300 times

3-5times 

Assembling and dismantling labor cost

$3.6-4.2/m²

$4.2-4.7/m²

Subtotal artificer materials 

$4.4-4.9/m²

$7.5-8/m²

Leveling the wall plastering labor cost

$0.4/m²

$2/m²

Leveling the wall plastering material cost

$0.3/m²

$2.6/m²

Economics

20m²/day

15m²/day

Final economic indicators

$5.9-6.4/m²

$12-13/m²

     

 

Products showing

 

 

Certificate:

ISO 9001:2008 

Bureau Veritas

SGS 

BCC for CERTIFICATE OF ENVIRONMENT MANAGEMENT

 

Our market:

China, Myanmar, Malaysia,Hongkong, Vietnam etc

 

Our Services:

 

1. OEM Service for All construction scaffolding system products

2. High Quality control system 

Send message to this supplier
Mr. Miss. Renny
Tel: 86-10-80871530
Enter between 20 to 3,000 chatacters.
Contact Method
Tianjin Jiuwei Industrial Co.LTD
Rm 0810, longfu Bd., No 432, Beijing, China (Mainland)
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!