powder coating system for powder spray

Price: 900.0 USD
Payment Terms: T/T,L/C,WU,Money Gram
skype
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • Brand name: FeiFu 
  • Coating: Powder Coating 
  • Voltage: 110/220V 
  • Power(W): 50W 
  • Hopper: 15L 
  • Weight: 37KGS 
  • Certification: CE 
  • Warranty: 1 YEAR 
  • After-sales Service Provided: Engineers 
  • powder coating machine: manual 
  • Model No.: FF-500T-H 
  • Place of Origin: Zhejiang  
  • Min.Order: 1 Set/Sets
  • Means of Transport: Ocean, Air, Land
Supply Capacity
  • Production Capacity: 600sets/month
  • Packing:wood case
  • Delivery Date: 2-7days

 

 

Detail

Place of Origin: zhejiang,China (Mainland)

Brand Name: FeiFu

Model Number:FF-500T-H


Coating: Powder Coating

Substrate: metal workpiece

Type: Powder Coating Gun

work theory: normal electrostatic coating

application: manual operating type

certification:  CE

 

→FUNCTIONS  

.The fluidzed powder in the powder hopper is sucked up in the injector by the conveying air. Through the powder hose the powder air mixture reached the gun 

.The powder is electrostatically charged immediately it reaches the gun nozzle.An intense field also exists between the gun nozzle and the grounded workpiece. The electrostatically charged powder sprayed onto the workpiece adheres to the latters surface.

.This line voltage is converted in the control module to high –frequence current

this currents stpped up by the high-voltage transformer and the HV-cascade in the gun to 100KV and applier to the electrodes.

.The converying air and the dosing air is to be requlated on the control module , the fluidizing air on the peneumatic unit.

.The powder is fluidized by forcing air from bleow truough a proous plastic plate. 

.The fluidized powder gets liguld –like properties.

 

→Technical Data 

 

Power range                                   100V/240v

Frequency                                     50/60HZ 

Temperature range in use                      -10 ℃+50 ℃

Powder Gun 

Gun weight:    ^^^                    500G

Rated output voltage ^…                      24VDC

Maximum output current  ^…                   180Ua(max)

Maximum output voltage^^                   0-100KV (  adjustable)    

Maximum powder injection :^…                    600g/min 

Polarity ^^^                                negative (-)   

Pneumatic technical spec 

Maximum input-air pressure ^^..                 8kg/cm 

Optimum input-air pressure^..                        6kg/cm 

Minimum input-air pressure   ^                      4kg/cm 

Maximum water vapor content or compressed air …..      1.4g/N m3  

Maximum oil vapor content of compressed air   ^..     0.1ppm

Maximum cimpressed-air consumption^…            13.2 m3/h

 

 

 

 

→Include Parts

Control unit

Spray Gun

Filter Unit

Air blow gun

Air hose ,powder hose ,ground wire and connector

 

 

 

 

 

Control unit for hopper model-Front 

 

 

 

MANUAL  GUN 

 

 

PLS supply the item number will order the spare parts for colo gun !

 

Packaging & Delivery

 

Packaging Detail:

in paper cartoon box

Delivery Detail

within 5 working days after deposit receiving

 

 

advantages

1. Can coat the objects' deepest corner by charging the powder continuously with low current and high voltage.

2. Can reduce orange peel effect significantly compare to common Electrostatic Coating .

3.Work well with pretreatment machine,reciprocator,powder recycle system,coating booth,oven to form a whole powder coating process

 

Technical index

 

Weight

15kg

Length

330mm

Power source

AC 220V

Ferquency

50Hz

Power

50W

Max Output Current

150μA

Input Voltage

0~24VDC

Output Voltage

100 KV

Polarity

Negative

High Pressure Mode

Inside

Max Power Injection

650g/min

Max Air Consumption

13Nm3/h

 

﹥WARNING 

 

--INSTALLATION 

→Propery ground all equipment in the spray area to an earth ground and maintain this ground 

→Remove all containers of volatiles from the spray area 

→Establish and maintain a grounded area for the spray operator 

→The gun of x series must be connect to x control unit

 

→OPERATION 

→The operator should hold the gun in his bare hand 

→If gloves are worm ,the palm should be out to assure skin to metal contact 

→The operator should wear shoes with conductive shoes e.g leather 

Rubber shoes are not conductive .

→Ground the tip of the gun before cleaning or changing nozzles. 

→When the gun is not in use , it should be hung so that the nozzle is within four inches of a grounded conductor 

→The operator should wear a filter-type respiator anytime he is exposed to dusty conditions 

→High pressure powder many cause injury ,Keep the rear switch  "off" position in no –use condiction 

 

→MAINTENANCE 

→Make a periodic confirmation of grounding to earh of all equipment in the spray area .

→Exercise good housekeeping practices , do not allow dirt or powder to accumulate on the feeder /powder unit , cable or gun.

→Keep the cabinet door 

 

PERSONNEL 

→Use saop and water to remove powder from the skin washing with solvents can cause reactions resulting in allergies and disourders.

→Wash hands before eating and smoking.

→Do not use compressed air to blow poder off the hands and clothing.

This practice may result in damage to the ear drums or eyes.

 

2. INSTALLATION 

→Connects the control units MAIN AIR to MAIN AIR(REGULATOR) output unit with air hose 

→Connects the control unit DOSING AIR to INJECTOR with air hose 

→Connects the FLUIDIZING AIR (REGULATOR )output unit to HOPPER with air hose 

→Connects the control unit AUXILIARY AIR to GUN with air hose 

→Connects the POWDER HOSE to INJECTOR 

→Connects the GUN CABLE to CONTROL UNIT with air hose 

→Connects  ground connection cable from ground nut to the booth and trolly 

→Connect main powder cable 

 

 

 

3. OPERATION 

 

→PREPARATION FOR TEST OPERATION 

1. Adjustment for for voltage selection 

All the shipped equipments are fixed at REQUEST

 

2. Connection of air supply 

 

.Compressed air must not contain any oil or mosture 

.It should be noticed that the oil and moisture container in the compressed air  must be filtered out. 

.The fluidfied air must be locked in until all connecctions are complected.

3. Connection outlet hose 

 

.Connect the hose by pressing it into the hoppers outlet –hose coupling hole. 

.Place the opposite end of the hose within booth.

Caution:Atmospheric pressure should be present in the hopper during operation of the equipment 

4. Connect ground line 

 

The ground line should be connected to booth or conveyor with a clip 

5. Safety regulations:

 

1) Operator should always take precaution to get grounded to the powder electroatic machine s GUN handle by marking hole in his gloves , He should also make it a rule to put on a pair of grounded shoes. 

2) The floor of workplace shoud be conducted 

3) All condusction material with 5 meters around powder booth are completely grounded 

4) Fact the GUN to dircetion of BOOTH and not to the human body 

5) In case of powder such as spaying paint ,dust density of 10g/ m3

Or more could cause explosion ,and the internal booth should be maintained in good and clean condition .

 

CHECK FUNCTION OPERATION 

 

1. Functions 

1) cuts off the powder supply from pressure-decrease valve.

2) Lowers the control box high –voltage adjustment handle  down to bottom –lef position . 

3) See what happens when the high-voltage adjustment handle is turned from to right to slowly increase the voltage level.

4) Approach the ground up to the distance of 500px holding GUN and see the high-voltage display drop.

5) Pull the GUN′trigger.

The high-voltage indicator begins to operate 

Check if the voltage level changes when the high-voltage adjustment handle is turned .

6) open MAIN AIR and suplly air 

7) pull the GUN′ trigger and open the CONVEYING AIR 

The pressure gauge hand moves

Pull the gun s trigger close the CONVEYING AIR and open the DOSING AIR

The gauge shand moves .

If all factors suggeted above is alright , every is O K 

Remove powder from the nozzle of gun by AUXILIARY AIR 

Power supply and fluidizing air supply.

2. LOADING 

open the lid 

fill powder up to the hoper s handle level 

colse the ld and assemble hose 

If everything checks alrigh, the quipment is ready 

Slightest abnormality requires preferring to the emergency –measure guide.

 

→TEST OPERATION 

1. PAINTING 

* CAUTION: Check if all the conducting material within 5 meters around powder booth are completely grounded 

1) Check if the powder is fluidified 

2) Turn on the powder switch 

3) Face the gun to direction of BOOTH

4) Pull the trigger 

5) Adjust the high voltage to the  required level-the level can be monitored by a meter 

6) Wait unitl the first-spayed  powder comes out completely dried.

7) Proceed with spraying object to be powder coated ..

 

 

2 Taking stop spraying measure 

1) release the GUN S trigger 

2) turn off the power switch 

as the powder is still fluid , you shouldnot  adjust the amount of high voltage . Cleaning air and powder output. 

3) Be sure to turn off the power switch and cut off air valve during lunch time or after sinishing work 

 

 

3 Cleaning the powder hose 

﹢ CAUTION: In case of prolonged unsue of equpment , the powder remaining in hose should be eliminate as follows:

1) take our injector s hose coupling part from the hopper 

2) Turn the GUN to the direction of BOOTH 

3) Attach the AIR GUN tightly to the hose entrance and blow into it 

4) Reassemble it 

 

First Pre-sale services:

 

     1). Select equipment model;

     2). Design and manufacture according to client's special requirement.

     3). Train technical personal for clients.

Second Services during the sale:

     1). Pre-check and accept products ahead of delivery.

     2). Help clients to draft solving plans.

Third After-sale service:

     1). Assist clients to prepare for the first construction scheme.

     2). Install and debug the equipment.

     3). Train the first-line operators.

     4). Examine the equipment.

     5). Take initiative to eliminate the trouble rapidly.

     6). Provide perfect service.

     7). Provide technical exchanging.

 

 

 

 

 

 


Send message to this supplier
Mr. Tom (mananger)
Tel: 86-571-87810513
Mobile: +86-18957102905
Enter between 20 to 3,000 chatacters.
Contact Method
HangZhou FeiFu Import Export Ltd
No.57 Xiangcang RD,Sandun Town,Xihu District, Hangzhou, Zhejiang, China (Mainland)
Fax: 86-571-85335616
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center