Rubber Compression Mold Product Product Product

Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Xiamen Better Silicone Co.,Ltd is a famous China rubber compression mold factory and supplier with customized compression molding,Website:http://www.silicone-seal.com, compression mould, please feel free to contact us.Rubber Compression MoldProduct Description1. Basic Properties1). Material: 50# steel, P20, or other customized material available2). Hardness: HRC42-HRC523). Shaping Mode: Rubber injection mould4). Fast mould design: Can be within 1-3 working days after getting customer's drawings5). Mould testing: All of the moulds can be well tested before the  shipments.6). Cavity: Single/multi7). Payment terms: L/C,T/T,Western Union,Paypal8). Delivery time       1-2 weeks after getting the mould design confirmation9). Port: Xiamen10). Steady Price: We have more steady price policy than our competitor2. Production Process 1). Sample/Drawing       We need your detail require clearly.          ↓2). Negotiation  Material,cavity,price,delivery time,payment term ,etc.          ↓3). Place order   According your own design          ↓4). Mould design      We will communicate & Exchange the opinion with you during making mold          ↓5. Tooling mould      After custome approve the mould design will start making mould.          ↓6). Mould process    Provide photos for customer show them tooling process            ↓7). Sample confirm   Send you sample for conformation          ↓8). Delivery mould    Delivery mould after customer approve sample and arrange shipment.3. Our Advantages1). Tooling design serviceWe accept customer's tooling design drawing,or tooling design service available 2). Fast tooling designWithin 1-3 working days after getting customer's drawings or samples.3). Tooling finish time6-9 working days after tooling design confirmation.4). Tooling testing   Will be well tested before the shipment or production.Trial samples can be shipped to you for confirmation if necessary.5). Lead time: Usually 7-11 working days.6). Mass production: Mass production service available.7). New product developmentWe can help you in new product development based on a new idea or rough drawing.8). Sample toolingSample tooling can be finished in shorter time or  cost USD350.9). Tooling packing  With firm package 
Send message to this supplier
Ms. Hardy Ho
Tel: 86-0592-5616002
Enter between 20 to 3,000 chatacters.
Contact Method
Xiamen Better Silicone Co.,Ltd
#832,Xinglong Road No.500, Huli District, Xiamen City, China, xiamen, fujian, China (Mainland)
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center