Continuous Level Indicator Asphalt Mixing Plant Mobile With Festo Air Cylinder

Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews

Continuous level indicator mobile asphalt batch mixing plant with Festo air cylinde

 

One by one location and installation of batch mobile asphalt plant.

 

Step 1,

Make the mixing tower in assigned position with the tractor, put down adjustable landing leg,drive the tractor awayunfold each platform,fix all partsinstall the handrailassemble straight tube of direct discharge storehouse

 

Set special hoisting bar ,buckle steel cable and lock catch,total 6(Figure1),hoisting position is foursquare place underneath the vibrating screen.

Use a 50T crane as main crane,a 25Tcrane as auxiliary crane,which hoist the mobile landing leg of main buildingtwo cranes hoist the main building tilting slowly,50T up,25T down(Figure2)keep the main building vertical,locate two landing legs of tyre side according to foundation,hoist main building to assigned positionunfold first floor staircase of main building,install staircase handrail,and fixhoist,install No.4 storage hopper.

 

 

Step 2, 

Make dryer and hoisting system mobile unit in assigned position by the tractor,put down adjustable landing leg,drive the tractor awayhoist it back and forth by a 25T crane,unfold each landing leg of dryer,and locate(hoist the whole system of dryer and hoisting system car by a 50T crane,and then unfold each landing leg of dryer,and locate

Make the stone slide horizontally to the fixureinstall stone platform and stone discharge nozzlefix steel cable on top of the stone,hoist the stone:make the stone surround rotating pivot to the appointed upright position with fan path by a 50T crane,keep the state,adjust supporting guide plate under-part of the stone,lock it to the groundinstall connecting piece between screen shell and stone discharge nozzle,and fixinstall battery tube of direct discharge bin,softconnect.

 

Step 3,

Make dust collector system mobile unit in assigned position,hoist the whole dust collector system car,unfold landing legs front ,back ,middle of the bag and locateconnect primary dust collector pipeline between this car and dryer hoisting system car,install cold blast valveconnect screw conveyer(2 sets)between under-part of collector and stone,mount conveyer bridgeconnect secondary induced draft pipe between the top of primary dust collector pipeline and vibrating screen shell.

Model QLB-Y1000 QLB-Y1500 QLB-Y2000
Output 80t/h (standard working condition) 120t/h (standard working condition) 160t/h (standard working condition)
Cold feeder Volume/No. 8M3/4 10M3/4 10M3/4
Agitator kettle Capacity More than 1000kg/batch More than 1500kg/batch More than 2000kg/batch
Drying Cylinder Φ1540*6800mm Φ1840*8100mm Φ2000*8860mm
Fuel type Diesel/mazut/LPG/Coal powder Diesel/mazut/LPG/Coal powder Diesel/mazut/LPG/Coal powder
Hot aggregate bin 20T/4 25T/4 25T/4
Ready product Temperature 130-165 130-165 130-165
Dust Collection method gravitational dust collector & Second baghouse dust collector gravitational dust collector & Second baghouse dust collector gravitational dust collector & Second baghouse dust collector
Asphalt tank capacity 20M3 30M3 30M3
Blackness of exhaust gas Ringelmann I Ringelmann I Ringelmann I
Operation room noise ≤70db(A) ≤70db(A) ≤70db(A)
Environment noise ≤80db(A) ≤80db(A) ≤80db(A)
Heat conduction oil furnace 300,000kcal/h 300,000kcal/h 500,000kcal/h
Total Installation Power ≈200kW ≈310kW 356KW

 

 

 

 


Send message to this supplier
Mr. Mr. Jia Wang
Tel: 86-510-85361108
Enter between 20 to 3,000 chatacters.
Contact Method
WUXI XITONG TECHNOLOGY GROUP
No88,Xuedian South Road, New District, Wuxi, Jiangsu, China (Mainland)
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center