Silicon 8620 carbon steel automobile casting parts joint part lost wax casting

Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews

joint part

Silicon 8620 carbon steel automobile casting parts joint part lost wax casting

Description

This part is for automobile, we use way of investment casting to produce, whose lead time will be 20-25 working days after PO. 

 

Item Description
Product Name joint part
Working Process Tooling make, wax mould, shell mould, pouring, cut and grind gate, shoot blast, after treatment, testing, packaging
Material 8620 carbon steel
Surface Treatment According to the requirement of customer
Application(Products cope) automobile, some parts connecting
Quality Control ISO9001, TS16949
Thickness Only to raw casting, more than 4mm
File Format Solidworks,Pro/Engineer,Auto CAD,PDF,JPG
Service 24-hour reply to customer's enquiry
Inspection IQC, IPQC,FQC,QA
Mould Depend on customer's require to make the mould.
Sample confirmation Before start mass production we will send the pre-production samples to customer for confirmation.We will modify the mould until customer satisfied.
Packing Inner Plastic Bag; Outer Standard Carton Box,Or according to customer's requirements

 

Payment & Shipping Terms:

Minimum Order Quantity: 5000
Price: Quoted per see the drawing or sample
Delivery Time: 20-25 working days after received PO
Payment Terms: T/T, L/C
Supply Ability: 50,000pcs per month

 

FAQ:

Q: Who Are We?

A: 1.We are a factory do the casting for more than 10 years.

2.Aroud more than 200 workers and 3000 square meter workshop

3.Customizing services, OEM services and good after services, etc.

 

Q: Where is your factory located? How can I visit there?

A: Our factory is located in ningbo city, zhejiang Province, China, near Shang hai. You can fly to Shanghai Pudong airport directly.

 

Q: What is the payment?

We prefer T/T, and also L/C if you want, the way of payment we can discuss.

 

Q: What is the lead time?

1. If we will start this project, we will start the tooling make and samples, which will be about 40-45 days after we received the PO.

2. If do the mass production, the lead time will be with 20 working days after receiving the PO.

 

GOOD SERVICE:

We will respond to you within 24 hours. We can manufacture nonstandard parts according to your drawings. And we offer best after sale service.

 

Why should you choose us?

1. We can do the part according to your drawing.

2. Rich experience and good technology support ( with senior and professional engineers with more than 7 years experience).

Send message to this supplier
Mr. Mr. Wang
Tel: 86-574-63751095
Enter between 20 to 3,000 chatacters.
Contact Method
OTTOMMO INTERNATIONAL CO., LIMITED
Zhangqi Industry Garden,undefined,undefined, Ningbo, Zhejiang, China (Mainland)
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!